TASK RISK ASSESSMENT |
|||||||
Project : |
Sim
Packing Expansion Project (Ware House) |
Date |
26/07/2016 |
||||
Team Members |
NAME:
Mr.
Anil Kandpal Supervisor(Contractor) |
NAME: Mr. Nirupam
Das
|
NAME: Mr.
Sherkhan Sayyad
|
NAME: Mr. Hemant
Nemade Lead HSE Engineer(RJIPL) |
NAME: Mr. Kalpesh
Dhamane Permit
Issuer(RJIPL) |
||
Signature |
|
|
|
|
|
||
Work Location : |
Main Store (Ware
House) |
||||||
Activity : |
Civil & Mechanical
Work |
||||||
Tools & equipment
Used : |
Vehicle, Portable Electrical
Tools, Lifting Tool & Equipment |
||||||
# |
Job Step Sequence of working
activities |
Hazard The potential to
cause harm (Health, Injury, Property damage, environment etc) |
CAUSE (Possible
causes that will potentially release a hazard) |
Consequences (The harm
which could possibly occur) |
Potential
Risk H / M / L |
Existing Barrier / Control Describe all existing
barriers / controls for each hazard |
Action By |
Residual
Risk H / M / L |
ALARP (Yes / No) |
||||||||||||
1.
|
1.Transportation
(VEHICLE MOVEMENT) 2. Stacking of Construction material 3. Crane Operation |
Unsafe speed of
vehicles Unauthorized Driver Fall of materials due to inadequate stacking. Defective slings
or shackles, Defective
Crane, Inadequate
ground condition, |
Personal injury
/Property damage Damage of
equipment. Serious bodily injury. Physical Injury Fall of lifted material / collapse of crane |
|
Medium Medium Medium Medium |
The speed of the vehicles
should never exceed 20KM/HR on site. Use Seat belts/helmets. Blow horn at the
intersections and during overtaking Operations. Maintain the vehicle in good
condition. Do not overtake
on curves, bridges and slopes. Ensure valid
vehicle driving licence. Proper stacking of the
materials. Maintain
safe height of stacked material. Use only inspected Slings. Safe access & egress should be provided. Proper PPE’s should be warned. Persons working should be trained Signboards/cautionary boards should be displayed. Competent supervision is required. Good housekeeping should be maintained. Avoid standing under the lifted load and within the
operating radius of cranes. Check periodically oil, brakes, gears, horns and
tyre pressure of all moving machinery. Check quality, size and condition of all chain
pulley blocks, slings, U-clamps, D-shackles, wire ropes etch Allow crane to move only on hard, firm and levelled
ground. Do not allow to workmen to work under the suspended
load. Check the vehicle /equipment prior to start the
work, Guide line to be used to control the load. Signalman, flagman to be used. Traffic rules should be followed |
Site Supervisor/Engineer |
Low Low Low |
|
||||||||||||
2 |
Site cleaning |
Sharpe edges Dust Snake bites/ insecticides Vehicles /machinery |
Bodily injury. Lung disease Poisoning Bodily injury ,may be death Serious bodily injury, property damage |
|
Medium Medium High
High |
Proper
PPE’S to be used. Hand
gloves to be used. Housekeeping
to be maintained. Hazards
to be known to all workers. Avoid unauthorized entry of people. Safe access to be provided. Dust
mask to be used. Housekeeping
is to be maintained. Proper
access is to be provided. Proper
PPE’S is to be warned. Housekeeping
to be maintained. First
aid box should be known to all workers. Working
area should be barricaded. Drivers
/ Operators must have valid documents & Test Certificates. All
drivers of earthmoving equipment to have an assistant to avoid taking the
machinery too close to the pit. Signal
man is to be posted for safe movement of earthmoving equipment &
vehicles. Stoppers
should be provided. Earthmoving
equipment & vehicles should be inspected before use. Should
have reversing alarm In
company premises vehicle speed limit must be 20KMPH. All
the posted traffic signs, signals and direction to be followed. Drivers
must have valid license. Reverse
horn is must have to all vehicles. Only
suitable vehicles should be used for transport. No person below 18 years is to be
allowed to work inside the premises. |
Site Supervisor/Engineer |
Low Low Low Low |
|
||||||||||||
3 |
Concreting / PCC 1. Material Handling Cement,Aggrigate,Sand,Steel,Stones) 2. Use of electrical mixers, vibrators etc. not
done. 3. Height work 4. Revolving of concrete mixer/ vibrators 5. Transporting 6. Placing 7. Curing |
Material handling, cement Cement dust Electrical Fall of
material /man Vibration Traffic accident Hands may get injured, Feet may get injured, Wet surface |
Bodily injury, Dermatitis Lungs disease. Lungs dermatitis Electrical
shocks Electrocution Can be get serious injury to the person. Tissue damage Traffic accident, Injury to persons Injury to person Person may fall down due to wet surface, injury to
workmen. |
|
Medium Medium Medium High Low Medium Medium Medium |
Use gloves , nose mask& required
PPE’s, Use mechanical means of to minimize
manual work, When lifting, bend legs and hold load
close the body. Instruct the worker to get help to lift
heavy materials Require workers to report back injuries. Use nose mask Ensure earthing of equipment and proper
functioning of electrical circuit before commencement of work Competent supervision is required. Work Permit system to be followed. Barricade the danger area. Use required PPE’S and safety nets Toe board for upper side to avoid of
falling material. Sign /cautionary board to be displayed. Provide helmets for the all the person. Allow only mixers with hopper Provide safety net around the structure Ensure that the person is not under
influence of any intoxication. Provide safety cages around moving
motors. Ensure proper mechanical locking of
vibratos’. Trained operator is to be used. Equipment to be checked periodically and
register to be maintained. Transporting Medium should be in good
condition, Use gloves &required PPE’s , Traffic rule is to be followed. Drivers must have valid license. Signboard/cautionary board is to be
displayed. Safe access to be provided. Training of Safe working Procedure
should be given to the worker Use gloves & other PPE, Proper Housekeeping is necessary. Clogging of water should be avoided Use
cautionary board. Ensure that proper arrangement of
pipeline is done to carry out curing at every place. Leakage of pipe is to be avoided. |
Site Supervisor/Engineer |
Low Low Low Low - Low Low Low |
|
||||||||||||
4 |
Reinforcement 1.Deflection
in props or shuttering material 2. Passage to work place 3. Proper stacking of unloaded reinforcement 4.Straightening of bars 5.Cutting/Bending/Placing/Binding
of Bars as per required size/length 6. Carrying and mixing of material 7. Laying of concrete |
Shuttering/props may collapse and prove fatal Improperly tied and designed props/planks may
collapse. Improper handling may cause injury stack may
collapse Improper handling may cause injury, continuous
activity may cause body pain Sharp edge may cause injury, Dust may inhaled by workers Improperly tied and designed props/planks may
collapse |
Chances of fatal accident, injury to workmen. Injury to persons. Personal injury, Back injury Strains & sprains Personal injury, Back injury Strains & sprains Personal injury Back injury Strains & sprains, Dermatitis, lungs disease Personal injury, Back injury Strains & sprains |
|
High Medium Medium Medium Medium Low Medium |
Permission is to be taken from concern
dept. Before start the work. Tool Box
meeting should be conducted. Safe access
& egress should be provided. Required PPE’s
should be warned. Avoid excessive stacking on shuttering
material. Rusting of base plate of props is to be
not allowed. Ensure that the props are to be rest on
hard & plane surface. Check the design and strength of
shuttering material before commencement of work. Rectify immediately the deflection noted
during concreting. Use cautionary board. Ensure the stability and strength of
passage before commencement of work, Do not overload and stand under the passage. Always stack at flat surface Barricade
the area and mark it. Required PPE. Unauthorized entry is to be prohibited. Planks are to be tied properly. Bifurcating of bars as per diameter
received. Testing of each lot to be taken. Training of Safe working Procedure
should be given to workers. Job rotation should be done. Required PPE’s (specially hand gloves). Material is to be handled proper way. Job rotation should be done. Cutter should be in good condition. Use safety goggles, hand gloves with
proper PPE’S. Use good quality transport medium for
carrying cement bags, avoid manual handling. Use proper PPE. Maintain safe distance, check machine
properly Job rotation should be done. Use gum boots and hand gloves. Do not stack huge quantity of concrete
on shuttering. |
Site Supervisor/Engineer |
Low Low Low Low Low - Low |
|
||||||||||||
5 |
Bar bending |
Unbalance Slip & Trip Fall of bar’s Strike to person Protruding rods |
Personal injury, bodily injury Personal injury, bodily injury Personal injury, bodily injury Personal injury, bodily injury Personal injury, bodily injury. |
|
Medium Low Medium Low Medium |
Tool Box meeting should be conducted. Safe access & egress should be
provided. Proper PPE’s should be warned. Persons working should be trained Signboards/cautionary boards should be
displayed. Competent supervision is required. Good housekeeping should be maintained. Properly handling of bar’s. Right men do the right job. Unwanted or debris to be removed and
bending point is away from rebar’s stocked. Unauthorized entry strictly prohibited. Protruding point to be bending or cover
properly. Material handling should be monitored. Proper instruction to be given about the
material handling Scrap should be properly arranged, stack
in scrap yard only |
Site Supervisor/Engineer |
Low - Low - Low |
|
||||||||||||
6 |
Shuttering & Deshuttering |
Fall of person. /material
Manual handling |
Injury to personnel Serious bodily in Back injury Strains & sprains |
|
High Medium |
Tool Box meeting should be conducted. Safe access & egress should be
provided. Proper PPE’s should be warned. (Safety Helmet , safety shoes , safety Hand gloves, dust mask, ear plug and
safety belt). Persons working should be trained. Require sequence of deshuttering to be
used, is to be checked physically. Signboards/cautionary boards should be
displayed. Competent supervision is required. Good housekeeping should be maintained. Proper ladder/scaffold should be used. Safety net, safety belt, lifeline to be
ensured. All material & tools must be kept
away at least away from the edge. Proper stacking is required Material handling procedure to be
followed. Material is to be handled proper way so
that back is to be always straight while manual lifting. Required persons to be used for lifting of steel. |
Site Supervisor/Engineer |
Low Low |
|
||||||||||||
7 |
Painting 1. Preparation of the surface, applying putty, Painting with spray paint 3.Use of paints |
Chemical may cause skin irritation, Fumes may
generate, Sharp edge may cause injury, and continuous work may cause body
pain. Fire |
Skin disease , injury due to sharp edges Injury to persons. Property damage. |
|
Medium Medium |
Trained workers to be used. Job rotation should be done Use proper PPE’S.(Helmet , Shoes, Hand
Gloves, Safety Belt.) MSDS is to be available near the work
place. Competent supervision is required. All labours should know about the
hazard. Use proper PPE’S Proper housekeeping is to be maintained. Paint drums should be store properly. Empty drums to be removed immediately
after the completion of work. Fire extinguishers to be provided. M.S.D.S. should be kept near the
workplace known to the all workers. Smoking should be restricted near the
work place. Signboard to be displayed. 3rd party certification for
compressor used for spray painting. |
Site Supervisor/Engineer |
Low Low |
|
||||||||||||
8 |
Carpentering work 1.Stacking of the Wood 2.Cutting of Wood as per required size/length 3. Finishing work and Fixing of all the
fittings/Hardware as per drawing |
Material may fall down on body part, continuous
activity may cause body pain Material may fall down on body part, while cutting
body part get caught in machine, Electrical shock Material may fall down on body part, Sharp edges may
cause injury |
Bodily injury, property damage Bodily injury, property damage Bodily injury, property damage |
|
Medium Medium Medium |
Stacking should be proper. Barricade the area and mark it Housekeeping should be maintained
properly. Job rotation should be followed. Use proper PPE. Machine should be checked properly
before use Use one socket for one appliance Ensure usage of only fully insulated
wires or cables. Ensure proper earthing to appliance. Do not use damaged cords and avoid
temporary connections Use proper Peruse full sleeve shirt. Plug –pin should be used. Use proper and good quality tools for
work Housekeeping should be maintained
properly Use proper PPE |
Site Supervisor/Engineer |
Low Low Low |
|
||||||||||||
9 |
Transporting ,Handling
,Lifting Of Material. |
Failure of lifting crane. Failure of lifting gears. Fall of person /material. Traffic accident Improper signal. |
Personnel injury, property damage Damage to property / equipment, Personnel injury, property damage . Injury to
person who may got accidents, property damage, Personnel injury, property damage Damage to property |
|
High High High Medium |
Tool Box meeting should be conducted. Safe access & egress should be
provided. Proper PPE’s should be warned. Persons working should be trained Signboards/cautionary boards should be
displayed. Competent supervision is required. Good housekeeping should be maintained. Confirm all road crossings and culverts. Equipment’s shall be checked in order to
ensure that there is no leak of hydraulic oil or any other defects. Crane operators shall have valid
Operator License. Never stand underneath of suspended load Signal man is to be posted & only he
will be only authorized to give the instruction to
driver/ operator All lifting devices/tackles must have
valid test certificates & must be inspected every day before using. Working area to be barricaded. PPE’S is to be warned for all employees. Trained employees are to be used. Competent supervision is required. All the posted traffic signs, signals
and direction to be followed. Drivers should have valid license. In company premises vehicle speed limit
must be 20KMPH Vehicle shall be parked in parking areas
only and shall not block any fire protective equipment & Movement of any other vehicle. Reverse horn is required. Only authorized person is allowed to
give signal. Training is to be provided for
signalman. Flagman should be provided with flags. |
Site Supervisor/Engineer |
Low Low Low Low |
|
||||||||||||
10 |
Working
at height |
Fall of person /material. |
Injury to personnel Serious bodily injury Chances of fatal accidents. |
|
High |
Work permit procedure should be
followed. Tool Box meeting should be conducted. Safe access & egress should be
provided. Proper PPE’s should be warned. Persons working should be trained Signboards/cautionary boards should be
displayed. Competent supervision is required. Good housekeeping should be maintained. Ladder/Scaffolding to be provided with
proper access to work at heights. Scaffold erection to be undertaken by
trained scaffolders working under competent supervision. Safe means of access /egress to be
provided and maintained for the scaffold to be erected Properly. Scaffolders should wear gloves, safety
footwear, safety helmets and safety harness during scaffold erection
activities. Scaffold components will be lifted using
safe techniques (Components will not be thrown up to the scaffolds) Unauthorized personnel will be excluded
from the area where scaffold erection is being carried out. Safety full body harness will be used
when working at heights of 2 meters or more. Climbing on Scaffolding Braces shall not
be permitted Defective ladder should not be used. Store the ladder proper place. Toe board to be available to avoid
falling material |
Site Supervisor/Engineer |
Low |
|
||||||||||||
11 |
Scaffolding (Working
Erection and dismantling of Scaffold) |
Fall of person /Material /Scaffold Slip & Trip Striking |
Injury to person ,Property damage injury to personnel Serious bodily injury Injury to personnel Serious bodily injury |
|
High Medium Medium |
Height work permits procedure to be
followed. Proper PPE’S should be used. Tool box meeting should be conducted. Trained person should be engaged for
scaffolding work. Scaffold Tag system should be followed. Do not allow to throw the material from
height Standard guidelines of scaffolding to adopt. Ensure base of scaffold is on compact
surface. Support of scaffold should be checked
and inspected Inspection of scaffold is to be done
frequently. Ensure that all the scaffold material is
of good condition. Use only Full body harness with double
lanyard. Good housekeeping should be ensured. Proper access
and egress should be provided. Tool box
meeting should be conducted about safe material handling. Trained person
should be used. Proper access
and egress should be provided. |
Site Supervisor/Engineer |
Low Low Low |
|
||||||||||||
12 |
Electrical Work |
Fire Electrical Shock |
Burn Injury Property Damage Electrical Shock Electrocution |
|
Medium High |
Only trained qualified electrician to be
allowed to electrical work . Fire extinguisher & bucket with
stand to be provided. Rubber mats for electrical panel. Proper Earthing should provide. All connections through ELCB rated 30MA. Local Earthing for 3 Phase device. Only 3 CORE & above SIZE cable to be
used. Cover shed for rein protection & PCC
floor for panel room. Trained and Experienced Electrician to
be allowed to electrical work . Regular Inspection to be done. Sign boards to be displayed. Avoid Joints of electrical cables. |
Site Supervisor/Engineer |
Low Low
|
|
||||||||||||
13 |
Gas cutting operation |
Gas cylinder Fire hazard Flying particles Tripping Hazard Dangerous fumes & gases |
Fire & explosion Fire & explosion Burns & Eye Injury Person may fall Health effect, lungs disease. |
|
Medium High Medium Medium |
Hot Work permit procedure should be
followed. Tool Box meeting should be conducted. Safe access & egress should be
provided. Proper PPE’s should be warned. Persons working should be trained Signboards/cautionary boards should be
displayed. Competent supervision is required. Good housekeeping should be maintained. Work area shall be barricaded & put
sign board of "Hot Work In Progress" Gas cutter should be trained &
understand the hazards of work area. Hose pipe should be free from leak and
crack Fire extinguishers to be Provided close
to work area. All flammable materials to be removed
before starting the job. Flash back arrester to be provided on
cutting set as well as cylinder side. Fire blanket to be provided to arrest
the falling hot metals. Oxygen and acetylene cylinders shall be
caped while moving. Keep cylinders on designated trolley. Appropriate eye protection will be worn
at all times during the operations. Gas cylinders will be kept clear of oil
and grease, which are spontaneously explosive in the presence of oxygen. Flash back arrestor to be provided. Proper housekeeping is to be maintained. Hoses should be keep proper way. Dust mask is to be used. Trained worker is to be used |
Site Supervisor/Engineer |
Low Low Low Low |
|
||||||||||||
14 |
Welding operation |
Flying particles. Electrical Dangers fumes & gases postural fatigue |
Fire & explosion Burns & Eye Injury. Electrical shocks Electrocution Lungs disease Stress& strain |
|
Medium High Medium Low |
Hot Work permit procedure should be
followed Tool Box meeting should be conducted. Safe access & egress should be
provided. Proper PPE’s should be warned. Persons working should be trained Signboards/cautionary boards should be
displayed. Competent supervision is required. Good housekeeping should be maintained. Work area shall be barricaded & put
sign board of "Hot Work In Progress" All flammable materials to be removed
before starting the job. Fire blanket to be provided to arrest
the falling spatters. Fire extinguishers to be Provided close
to work area. Trained Fire watch with portable air
horn to be deployed All welding PPEs to be used. Do not allow anyone to stand too close
to the work or stare at arc. Put used welding rods in a metal
container. Welding m/c shall be inspected prior to
use & must be grounded. Proper electrical connections/Grounding
of Equipments Electrode holder to be insulated except
jaw Proper cable routing to be ensured. Use of ELCB is must. Cable should not have any joint. Defective plugs must not be used. Routine inspection by electrician is
required. Proper PPE’S is to be used, like rubber/
leather hand gloves etc. Nose mask is to be used. Well-ventilated area to be used for
welding work. Safe workplace is to be provided to
avoid postural fatigue. Safe access is to be provided. |
Site Supervisor/Engineer |
Low Low Low - |
|
||||||||||||
15 |
Grinding Operation |
Flying particles Electrical Tripping Hazard.(due to electrical cables) Rotatory part of m/c Dust particles Noise |
Eye/cut/burn injuries. fire Electric shock, electrocution, fire Person may fall on ground and can get injury. Serious fingers injuries Eye injury, may be severe injury. Headache , Hearing loss. |
|
Medium High Medium Medium Medium Medium |
Hot Work permit procedure should be
followed Tool Box meeting should be conducted. Safe access & egress should be
provided. Proper PPE’s should be warned. Persons working should be trained Signboards/cautionary boards should be
displayed. Competent supervision is required. Good housekeeping should be maintained. Work area shall be barricaded & put
sign board of "Hot Work In Progress" All flammable materials to be removed
before starting the job. Fire blanket to be provided around the
work area to arrest the flying spark. Fire watch to be deployed with portable
horn & fire fighting equipment. Face shield and other PPE shall be worn
at all times. Electrical power tools shall be provided
by ELCB. Grinding m/c shall be inspected prior to
use & must be grounded. Grinding machine, cable connection shall
be checked daily by electrical supervisor. Proper electrical connections/Grounding
of Equipments Proper cable routing to be ensured. Cable should not have any joint. Defective plugs must not be used. Routine inspection by electrician is
required. Insulation of cable should be in good
condition Proper PPE’S is to be used. Proper housekeeping is to be maintained. Cable is to be put orderly. The RPM of grinding wheel shall be
marked on the grinder. Proper rated grinding Wheel with guard
shall be used. Mount specified speed rated & tested
wheel to m/c. Proper cable routing to be ensured for
slipping and tripping hazards. Trip switch /sleek guard to be used. A trained worker is to be used. Proper PPE’S is to be used like face
shield, safety glasses etc. Ear plug is to be used. Noise survey is to be done. Noise hazard is to be explained to
workers. |
Site Supervisor/Engineer |
Low Low Low Low Low Low |
|
||||||||||||
16 |
Drilling Operation |
Rotatory part of m/c Electrical. |
Eye/cut/burn injuries. Electric shock, electrocution, fire |
|
Medium High |
Tool Box meeting should be conducted. Safe access & egress should be
provided. Proper PPE’s should be warned. Persons working should be trained Signboards/cautionary boards should be
displayed. Competent supervision is required. Good housekeeping should be maintained. Standard operating procedure is to be
followed. Ensure the proper earth connection. Do not insert bare wires into the
socket. Use proper drill shuck key for realizing
or fixing the drill bits. Damaged tools should not be used. Flying particles to be collected in
tray. Check m/c before using by electrician. Electrical cable should not have any
joints. Don’t use defective plug. Electrical connection should be proper. Use one socket for one plug. Plugs, pins to be used. |
Site Supervisor/Engineer |
Low Low |
|
||||||||||||
17 |
Handling reinforced steel bars |
Fall of material
while loading / unloading. Injury with the
protruding/ piercing ends. |
Severe
Head Injury. Injury |
|
Medium Low |
Use of proper PPE while loading / unloading the
reinforced bars. Use of safety shoe, safety gloves. |
Site
Supervisor/Engineer |
Low - |
|
||||||||||||
18 |
Gas, Diesel storage |
Explosion. potential fire due to combustible items,
Spillage/ leakage, |
Fire
hazarded |
|
Medium |
Near Diesel storage remove the combustible
items,
housekeeping
in storages of tanks. Warning Sign display near work location Using of Fire
Extinguisher. |
Site
Supervisor/Engineer |
Low |
|
||||||||||||
19 |
Use of Hydra |
Potential injuries while using hydra for
material handling,
Accidents due to fall of objects. Physical contact of grease & other
chemical |
Injury
& Accidents |
|
Medium |
Ensure
presence use of PPE's Proper Signalling, Proper hydra
movements, Driving only in
license holder driver |
Site
Supervisor/Engineer |
Low |
|
||||||||||||
20 |
Fire protection of site office / stores |
Ignition sources |
injury |
|
Low |
Materials should be stacked properly and must be
segregated.
Avoid ignition
sources.
Do
not smoke and provide proper signage. Provide
portable fire fighting equipment like fire extinguishers, sand buckets and
water etc. |
Site Supervisor/Engineer |
- |
|
||||||||||||
21 |
Storage/handling of Cement |
inhalation of the cement dust fall of cement bags |
Lung
diseases and occupational ill health Injury |
|
Medium Low |
Dust masks provided to all workers working for
cement loading and provide banana or sweet to all workmen’s Proper stacking, loading and unloading methods.
Training for manual handling and lifting and Follow. |
Site
Supervisor/Engineer |
Low - |
|
||||||||||||
22 |
Air compressor |
Compressor hose can hit the human parts
of the body. Exposure of high Noise. High pressure. Fire & Explosion. |
personnel
injury Hearing
problem injury Due
to improper housekeeping & Maintenance. |
|
Medium Medium Medium Medium |
Precaution, checking of air receiver. Monitor
Pressure level. Silencer to be provided and Use of ear plugs, muffs. All the pipe joint to be fixed properly and Checking
of pressure periodically. Regular Housekeeping, Hot works to be not allowed
near the compressor area, Compressor to be certified with third party, Spark
arrestor to be provided for air compressor. |
Site
Supervisor/Engineer |
Low Low Low Low |
|
||||||||||||
23 |
Working in Night Shifts |
Improper illumination, Strain |
Severe
Injury or Fatal |
|
High |
Ensure Proper illumination, Separate Staff/workers
for night shift, Entry and exit requestor monitoring, Conducting tool box
talks, Ensure adequate supervision, Ensure PTW for night shift activities. |
Site Supervisor/Engineer |
Low |
|
||||||||||||
24 |
Sand Blasting Mobilization of equipment |
Falling
hazards /Vehicle
incident |
Minor
injury
Collision Fatality |
|
Medium |
Trained vehicle operator Qualified signal /Rigger. Provide
Proper PPE's.
|
Site Supervisor/Engineer |
Low |
|
||||||||||||
Setting up and testing of equipment |
Struck by compressed/air/hose/Faulty Air Receiver |
Bodily
injury |
|
Medium |
Equipment checklist required
Adequate safety features Provide proper PPE's
Checking
validity of air receiver |
Low |
|
||||||||||||||
Top of blasting grit |
Falling hazards |
Bodily
injury |
|
Medium |
Properly covered area. Proper Barricade area Qualified signal/rigger. |
Low |
|
||||||||||||||
Commencement of grit blasting |
Struck by compressed/air/hose. Trip & Fall Dust inhalation Overcome by co when using
diesel operated Air compressor for breathing air supply |
Bodily
injury Lung
disease |
|
Medium |
Permit to work required Provide appropriate PPE’s Equipment
checklist required
Provide adequate lighting/ No obstruction Co modification
supply compressed air (Visual or audible alarm) Checking of
air filter Maintenance require to verify equipment safety after
job completion. |
Low |
|
||||||||||||||
Grit removal and emptying the grit |
Ergonomic
Dust inhalation |
Back Pain Lung disease |
|
Medium |
Provide appropriate PPE's |
Low |
|
||||||||||||||
Transporting
of blasting equipment/material by forklift/lorry truck from store to work
site |
Moving
vehicle |
Collision
of forklift/lorry truck |
|
Medium |
Qualified operator required Working condition of vehicle.
Ensure the load is within the safe working load. observe yards speed limit Ensure clear passageway before operating vehicle. Maintain a clear vision of the operator. |
Site Supervisor/Engineer |
Low |
|
|||||||||||||
Falling
object |
Strike by
falling object |
|
Medium |
Secure proper load Ensure clear
passageway from surrounding area. Lifting equipment is valid and in safe working
condition. Safe working
load of lifting equipment |
Low |
|
|||||||||||||||
Setting up
and testing of equipment |
Falling of object |
Strike by falling object |
|
Low |
Secure proper load Ensure clear passageway from surrounding area. Lifting
equipment is valid and in safe working condition. Safe working
load of lifting equipment |
- |
|
||||||||||||||
Hand &
Fingers injury /Bodily injury |
Pinch
point areas |
|
Low |
Provide appropriate PPE’s (hand gloves) Maintain two way
communication
Using trained personnel Safe manual handling practice. |
- |
|
|||||||||||||||
Slip,
Trip/Fall |
Slip and
fall on slippery work surface or trip and fall over hoses placed at
passageway |
|
Medium |
Maintain clean and dry work place at all times Do
not place blasting hoses at passageway. Hang up of blasting hoses using cable hanger. |
Low |
|
|||||||||||||||
Blasting
Operation |
High Pressure Noise |
Bodily injuries Noise induced
deafness |
|
Medium |
Physical check on hose condition
Secure if hoses Relief valve in safe working condition.
Functional test required Proper protective clothing |
Low |
|
||||||||||||||
Exposure to dust |
Inhalation(Respiratory problems) Overcome
by CO |
|
Medium |
Blasting
hood(Air fed) required CO
monitoring device installed
Electrical generated compressed air |
Low |
|
|||||||||||||||
|
|
Surrounding people bit by spent grit |
|
Low |
Working place properly covered
Display warning sing board Blaster to
look out prior to blasting |
- |
|
||||||||||||||
|
Demob of blasting equipment |
High Pressure Noise |
Hit by flying grits Remaining pressure in the hose |
|
Medium |
Release pressure before disconnecting hose. |
Low |
|
|||||||||||||
25 |
Erection
of Structure material |
Fall of
materials /persons. Hit
against existing object. Hit by
moving objects, Failure of
lifting M/C tool & Tackles. |
Injury to person due to fall of person or
fall of material, chances of fatal accident Personal injury Personal injury/Property Damaged Fall of lifted material/ Collapse of Hydra,
Crane |
|
High Medium Medium High |
Only Trained worker shall be used for rigging and
lifting at site. Fall arrestor, Safety nets and all required PPE
shall be used. Only certified lifting M/C, Tool and tackles shall
be used for lifting. Barricading of Crane swing area and worker shall not
be allowed to work anytime below loads. A standby person shall be used for proper
communication with crane operator. Wooden sleepers shall be used in case soil is loose. At any time lifting M/C Tool and Tackles shall not
be loaded more than rated SWL Market. Lifting M/C Tool and Tackles shall be inspected on a
weekly basis. Use proper guy ropes to avoid swinging of ropes with
load. Adequate warning notices shall be placed to wan
workers about the hazards. Adequate shoring shall be provided to nearby
excavations. Work permit system shall be followed. |
Site Supervisor/Engineer |
Low Low Low Low |
|
Foot Notes:
1.
Permit Issuer ensures all the controls are in
place before job starts
2.
Method statement to be made available BEFORE
conducting TRA.
3.
TRA must be available at work place along with
work permit.
4.
No Work should be carried unless Risk is at LOW
level.
PROBABILITY |
||||||
SEVERITY |
PEOPLE |
Remote
Possibility- A similar event has not occurred in our industry |
Similar
event has occurred somewhere in our industry & within group |
Likely
to occur once or twice in the lifetime of facility |
Event
Likely to occur several times in the lifetime of the facility |
Common
Occurrence(at least annually) at the facility |
1.
Catastrophic |
Multiple
Fatality |
|
|
|
|
|
2.
Severe |
Single
Fatality or Permanent Disability |
|
HIGH |
|||
3.
Critical |
Major
Injury or Health Effects |
MEDIUM |
|
|||
4.
Marginal |
Minor
Injury or health effects |
|
(ALARP) |
|||
5.
Negligible |
Single
injury or health effects |
LOW |
|
|
,