1.0        SCOPE OF WORK :

 

1.1             Work under this section shall consist of furnishing all material and labour necessary and required to completely install all sanitary fixtures, chromium plated fittings and accessories as required by the drawings specified hereinafter and given in the Schedule of Quantities.

 

1.2             Without restricting to the generality of the foregoing the sanitary fixtures & C.P. fittings shall include the following: 

a)                               Sanitary fixtures

b)                               Chromium plated fittings

c)                               Stainless steel sinks

d)                    Accessories e.g toilet paper holders, coat hook, dispenser etc.

e)                    Mirror

 

1.3               Whether specifically mentioned or not all fixtures and appliances shall be provided with all fixing devices, nuts, bolts, screws, hangers as required. 

1.4          All exposed pipes within toilets and near fixtures shall be chromium plated brass or copper unless otherwise specified.

 

2.0          GENERAL REQUIREMENTS:

 

2.1           All materials shall be new and of best quality confirming to specification and subject to the approval of the Architect/Consultants. Wherever particular makes are mentioned, the choice of selection shall remain with the Owner/Architect.

 

2.2           Sanitary fixtures shall be of the best quality approved by the Owner/Architect. Wherever particular makes are mentioned, the choice of selection shall remain with the Owner/Architect.

 

2.3           All Appliances, fixtures and fittings shall be provided with all such accessories as are required to complete the item in working condition whether specifically mentioned or not in the Schedule of Quantities, specifications, and drawings. Accessories shall include proper fixing arrangement, brackets, nuts, bolts, screws and required connection pieces.

 

2.4           Fixing screws shall be half round head chromium plated brass screws with C.P. washers where necessary.

 

2.5           Porcelain sanitary ware shall be glazed vitreous china of first quality     free from warps, cracks and glazing defects confirming to I.S. 2556.

 

2.6           Sinks for pantry or kitchen shall be stainless steel or as specified in the schedule of quantities.

 

2.7             Chromium plated fittings shall be cast brass chromium plated of the best quality approved by the Owner/Architects.

 

2.8             All Appliances, fittings and fixtures shall be fixed in a neat workmanlike manner true to level and heights shown on the drawings and in accordance with the manufacturers recommendations. Care shall be taken to fix all inlet and outlet pipes at correct positions. Faulty locations shall be made good and any damage to the finished floor, Filing Plaster, Paint, insulation or terrace shall be made good by the Contractor at his own cost.

 

2.9             Sanitary appliances, subject to the type of appliance and specific requirements, shall be fixed in accordance with the relevant standards and the following :

           

a)                 Contractor shall, during the entire period of installation and afterwards protect the appliances by providing suitable cover or any other protection so as to absolutely prevent any damage to the appliances until handing over. (The original protective wrapping shall be left in position for as long as possible).

 

b)                 The appliance shall be fixed in a manner such that it will facilitate subsequent removal if necessary.

 

c)                 All appliances shall be securely fixed. Manufacturers’ brackets and fixing methods shall be used wherever possible. Compatible rust- proofed fixings shall be used. Fixing shall be done in a manner that minimizes noise transmission.

 

d)                 Pipe connections shall be made with demountable unions. Pipe work shall not be fixed in a manner that it supports or partially supports an appliance.

 

e)                   Appliances shall be fixed so that water falls to the outlet.

 

f)                  Appliances shall be fixed true to level firmly fixed to anchor or supports provided by the manufacturer and additional anchors or supports where necessary.

 

2.10     Sizes of Sanitary fixtures given in the Specifications or in the Schedule of Quantities are for identification with reference to the catalogues of makes considered. Dimensions of similar models of other makes may vary within + 10% and the same shall be provided and no claim for extra payment shall be entertained nor shall any payment be deducted on this account.

 

 EUROPEAN WATER CLOSET:

 

a)                  WC shall be single or double siphonic wash down type floor/ wall mounted set, as shown in the drawings, flushed by means of a flushing cistern.

                           

b)                  Each W.C. set shall be provided with a solid plastic seat of colour given in the schedule of quantities, rubber buffers and chromium plated hinges. Plastic seat shall be so fixed that it remains absolutely stationary in vertical position without falling down on the W.C.

 

c)                   Flush pipe/bend shall be connected to the Water Closet by means of suitable rubber adapter.

 

d)                  Wall hung Water Closet shall be supported by C.I. chair.

 

4.0       URINALS:

 

4.1           Urinals shall be lipped type half stall white glazed vitreous china of best quality and size as mentioned in the Schedule of Quantities.

 

4.2           Half stall urinals shall be provided with 15 mm dia C.P. spreader, 32 mm dia C.P. domical waste and C.P.As. brass bottle trap with pipe and wall flange and shall be fixed to wall by C.I. brackets, C.I. wall clips and CP brass screws as recommended by manufacturer complete as directed by Architect/Consultants.

 

4.3           Flushing for urinals shall be by means of no hand operation, infrared electric flush valve with complete kit of plumbing, infrared photocells, solenoid valve. The automatic flush sensor plate shall be flush and press fitted and be of high quality mirror polish finish. Each urinal shall be provided with one flush valve unit.

 

4.4           Flush pipes shall be GI pipes concealed in wall chase but with chromium plated bends at inlet and outlet or as given in Schedule of Quantities. These shall be measured and paid for separately.

 

4.5           GI waste pipes shall be provided for urinals wash basin, sink.

 

5.0       URINAL PARTITIONS:

 

5.1             Urinal partitions shall be white glazed vitreous china of size specified in the Schedule of Quantities.

 

5.2           Porcelain partitions shall be fixed at proper heights with CP brass bolts, anchor fasteners and MS clips as recommended by the manufacturer and directed by the Architect/Consultants.

  

6.0                WASH HAND BASIN :

 

6.1               Wash basins shall be coloured or white glazed vitreous china of best quality, size, shape and type specified in the Schedule of Quantities.

 

6.2             Each basin shall be provided with painted MS angle or CI brackets and clips and the basin securely fixed to wall. Placing of basins over the brackets without secure fixing shall not be accepted. The MS angle shall be provided with two coats of red oxide primer and two coats of synthetic enamel paint of make, brand and colour as approved by the Architect/Consultants.

 

6.3               Each basin shall be provided  with 32 mm dia C.P. waste of standard pattern with pop-up waste or rubber plug and chain as specified in the Schedule of Quantities, 32 mm dia C.P. brass bottle trap and angle valve with C.P.pipe to wall and flange as given in the schedule of quantities.

 

6.4               Each basin shall be provided with single hole mixing fitting or as specified in the Schedule of Quantities.

 

6.5               Basins shall be fixed at proper heights as shown on drawings. If height is not specified, the rim level shall be 80 cms or as directed by Architect/Consultants.

 

7.0        SINKS :

 

7.1                Sinks shall be white glazed fireclay or vitreous china or stainless steel or any other material as specified in the Schedule of Quantities.

 

7.2              Each sink shall be provided with M.S. or C.I. brackets and clips and securely fixed. Counter top sinks shall be fixed with suitable painted angle iron brackets or clips as recommended by the manufacturer. Each sink shall be provided with 40 mm dia C.P. waste with china and rubber plug with CP Brass chain as given in the Schedule of Quantities. The MS Angle shall be provided with Two coats of red oxide primer and two coats of synthetic enamel paint of make, brand and colour as approved by the Architect/Consultants.

 

7.3                Each sink shall be provided with hot and cold mixing fittings or CP taps as specified in the schedule of quantities.

 

8.0           MIRRORS :

 

8.1        Mirrors shall be electro coated copper 5.5mm thick of approved make. The size shall be as specified in the Schedule of Quantities or as shown on the drawings. The image shall be clear and without waviness at all angles of vision.

 

8.2       Mirrors shall be provided with backing of 12mm thick marine plywood or 6mm thick cement asbestos sheet fixed with CP brass semi round headed screws and cup washers or CP brass clamps as specified or instructed by Architect/Consultants.

            TOILET PAPER HOLDER :

 

9.1       Toilet paper holder shall be of CP brass, powder coated/S.S. heavy duty of approved make and colour or as specified in Bill of Quantities.

 

 

10.0     HAND DRIER :

 

10.1     The hand drier shall be no touch operating type with solid state time delay to allow user to keep hand in any position.

 

10.2     The hand drier shall be fully hygienic, rated for continuous repeat use (CRU).

 

10.3     The rating of hand drier shall be such that time required to dry a pair of hands up to wrists is approximately 30 seconds.

 

10.4    The hand drier shall be of wall mounting type suitable for 230V, single phase, 50 Hz, AC power supply.

 

11.0     TOILETS FOR DISABLED(IF PROVIDED IN THE DWGS):

 

11.1    Where specified in washroom facilities designed to accommodate physically handicapped, accessories should be provided as directed by the Project Manager.

 

11.2    Stainless steel grab bars of required size suitable for concealed or exposed mounting and non-slip gripping surface shall be provided in all washrooms to be used by physically handicapped as directed by the Project Manager.

 

12.0     ACCESSORIES:

 

12.1     All C.P. bib taps and Angle valves shall be quarter turn-type washerless fittings. The angle valve shall be provided with stainless steel mesh filter.

 

12.2     Contractor shall install all chromium plated stainless steel and powder coated accessories as shown on the drawings or directed by Architect/Consultants and given in the Schedule of Quantities.

 

12.3    All C.P. accessories shall be fixed with C.P. brass half round head screws and cut washers in wall with rawl plugs or nylon sleeves and shall include cutting and making good as required or directed by Architect/Consultants.

 

12.4     Joints/ gaps between all sanitary appliances/fixtures and the floor/ walls shall be caulked with an approved mildew resistant sealant, having anti-fungal properties, of colour and shade to match that of the appliance/ fixture and the floor/ wall to the extent possible.

 

13.0     TESTING:

 

All appliances, fixtures and fittings shall be tested before and after installation. Water seals of all appliances shall be tested. The Contractor shall block the ends of waste and ventilation pipes and shall conduct an air test with a pressure of 38mm water gauge for minimum of 3 minutes in accordance with BS:5572.

 

14.0     MEASUREMENT

14.1     Sanitary fixtures shall be measured by numbers.

 

14.2     Rate for providing and fixing of sanitary fixtures, accessories shall include all items, and operations stated in the respective specifications and Schedule of Quantities and nothing extra is payable.

 

14.3     Rates for all items under specifications paras above shall be inclusive of cutting holes and chases and making good the same, C.P. brass screws, nuts, bolts and any fixing arrangements required and recommended by manufacturers, testing and commissioning etc. complete.

14.4     Mirrors shall be measured on surface area basis in sqm/Nos.

 

B)         SOIL, WASTE, VENT & RAIN WATER PIPES:

 

1.0          SCOPE OF WORK :

1.1        Work under this section shall consist of furnishing all labor, materials, equipment’s and appliances necessary and required to completely install all soil, waste, vent, AHU drain, Rain water pipes, drainage sump riser and fittings as required by the drawings and given in the Schedule of Quantities.

1.2          Without restricting to the generality of the foregoing, the soil, waste, vent pipe rain water system shall include the following :-

a)           Horizontal  and Vertical C.I. soil, waste and vent pipes, and fittings, Drip seal joint, clamps and connection to fixtures.

b)                 Floor and Urinal traps, Floor Drain, Cleanout plugs, G.I. inlet fittings and CP brass/stainless steel grating.

 

c)           Waste pipe connection from all fixtures e.g wash basins, sinks, urinals, kitchen equipments and plant room equipment.

d)            uPVC/CI Rain water pipes/CI(LA) Drainage/Sewage Sump Pmu Riser.

e)            uPVC sump vent pipe and fittings.

 

2.0          GENERAL:

2.1       All materials shall be new of the best quality conforming to IS codes and

Specifications and subject to the approval of Consultants.

2.2       Pipes and fittings shall be fixed truly vertical, horizontal or in slopes as required

in a neat workman like manner.

2.3       Pipes shall be fixed in a manner as to provided easy accessibility for repair and

maintenance and shall not cause obstruction in shafts, passages etc.

2.4        Pipes shall be securely fixed to walls and ceilings by suitable clamps at     intervals specified.

2.5        Access doors for fittings and cleanouts shall be so located that they are easily accessible for repair and maintenance.

 

2.6        All work shall be executed as directed by the Engineer-in-charge.

 

3.0        CENTRIFUGAL CAST IRON (SPUN) PIPE :

 

3.1                Soil, waste, vent and anti-siphonage pipes, fittings and accessories shall be centrifugal cast iron (spun). All pipes shall be straight and smooth and their inside free from irregular bore, blow holes, cracks and other manufacturing defects. Pipes shall be centrifugally cast (spun) iron soil pipes conforming to IS: 3989-1984.

 

3.2                Standard weight, dimensions and pig lead required for joints shall be as follows:

 

For pipes conforming to IS:3989-1984 (centrifugally spun C.I pipes)


S.No.

Nominal Diameter

Thickness

Approximate mass including mass of  Socket for pipe length1.80m

Internal diameter

of socket

Depth of

 lead

Weight

Of lead yarn

 

Mm

mm

Kg

mm

Mm

Kg

1

75

3.5

12.5

99

25

0.600

2

100

4.0

18.8

126

25

0.850

3

150

5.0

34.9

178

25

1.300

4

200

6.0

51.0

 

 

2.00

 

 

37.0     Tolerance:

 

Acceptable tolerance for pipes to IS:3989 shall be as follows:

 

a)

Wall thickness

- 15%

b)

Length

+20 mm

c)

Weight

-10%

 

4.0       FITTINGS :

 

4.1                Fittings shall conform to the same Indian Standard (IS : 3989-1984) for pipes. Contractor shall use pipes and fittings of matching specifications.

 

4.2                Fittings shall be of the required degree of curvature with or without access door as detailed in the drawings or as directed.

 

4.3           Access door shall be made up with 3mm thick insertion rubber washer and white lead. The bolts shall be lubricated with grease or white lead for easy removal later. The fixing shall be air and water tight.

 

5.0         FIXING:

 

5.1                   MS clamps truly vertical shall fix all vertical pipes. Branch pipes shall be connected to the stack at the same angle as that of the fittings. No collars shall be used on vertical stacks. Each stack shall be terminated at top with a cowl (terminal guard).

 

5.2                   Horizontal pipes running along ceiling shall be fixed on structural adjustable clamps of special design shown on the drawings or as directed. Horizontal pipes shall be laid to uniform slope and the clamps adjusted to the proper levels so that the pipes fully rest on them.

 

5.3               Contractor shall provide all sleeves, openings, hangers, inserts during the construction. He shall provide all necessary information to the building Contractor for making such provisions in the structure as necessary. All damages shall be made good by the Contractor at his own cost to restore the surfaces.

 

6.0         CLAMPS :

 

6.1                   Holder bat clamps shall be of standard design fabricated from MS flats 40x3mm thick and 12mm dia MS rod and 6mm nuts and bolts; painted with two coats of black bitumen paint before fixing. The clamps shall be fixed in cement concrete 1:2:4 mix (1 cement : 2 sand : 4 stone aggregate 20mm nominal size) blocks 100x100x100mm deep.

 

6.2                   Where holder bat clamps are to be fixed in RCC column or slotted angles, walls or beam they shall be fixed with 40x3mm flat iron “U” type clamps with anchor fasteners of approved design.

 

6.3                   Structural clamps shall be fabricated from MS structural members e.g. rods, angles, channels, flats as per detailed drawing or as directed. Contractor shall provide all nuts, bolts, welding material and paint the clamps with one coat of red oxide and two or more coats of black enamel paint to give an even shade.

 

6.4                   Wherever MS clamps are required to be anchored directly to brick walls, concrete slabs, beams or columns, nothing extra shall be payable for clamping arrangement, RCC block and making good with cement concrete 1:2:4 mix (1 cement : 2 sand : 4 stone aggregate 20mm nominal size) as directed by the Architect/Consultants.

 

7.0         TRAPS :

 

7.1         Floor Trap:

 

Floor trap shall be cast iron ‘P’ Trap with or without vent horn (deep seal with an effective seal of 50 mm). In case of Sunken slab in the Toilets, the trap and waste pipes shall be set in cement concrete blocks of size 300mm x 300mm and of required depth, firmly supported on the structural floor. The blocks shall be in 1 :2 :4 mix (1 cement : 2 coarse : 4 stone aggregate 20mm nominal size) and extended to 40mm below finished floor level. Contractor shall provide all necessary shuttering and centering for the blocks at no extra cost. ). In case of flat slab instead sunken slab in the Toilets, Contractor shall provide all sleeves, openings, hangers, inserts during the construction for fixing the floor traps and etc.

 

7.2                   Urinal Trap:

 

Urinal traps shall be cast iron P or S traps with or without vent horn and set in cement concrete block specified under Clause 7.1 Floor Trap without extra charge.

 

 

 

7.3                   Floor Trap Inlet/GI Inlet Fitting:

 

 Traps and connections shall ensure free and silent flow of discharging water. Where specified, Contractor shall provide a special type cast iron or G.I. inlet hopper without or with one or two or three inlet sockets to receive the waste pipe. Joint between G.I. waste pipe and hopper inlet socket shall be Drip seal joint. Hopper shall be connected to a CI ‘P’ or ‘S’ trap with at least 50mm seal (hopper and traps shall be paid for separately). Floor trap inlet hoppers and the traps shall be set in cement concrete blocks/and supports as specified under clause 7.1 Floor trap above without extra charge.

 

8.0         CP/S.S. GRATING :

Floor and Urinal Traps, Floor drain shall be provided with 80-125 mm square or  round C.P./stainless steel grating with rim of approved design and shape. Minimum thickness shall be 4 mm or as specified in the Schedule of Quantities.

 

9.0         JOINTING :

 

Soil, waste, vent and anti-siphonage pipes shall be jointed with Lead joint/Drip seal joint as mentioned in the BOQ.

              The following minimum procedures shall be complied with while making the pipe joints :-

 

Ensure that the pipes are clean internally and undamaged.

 

a)                        The pipes shall be cut square with sharp tools.

 

b)                        The cut ends of the pipes shall be filed/ reamed and finished smooth.

 

c)                         Any deformed ends shall be re-rounded.

 

d)                        It shall be ensured that the pipe ends shall enter the fittings and sockets to full depth of the jointing area.

 

e)                        The pipe work shall be assembled in a manner such that it does not entail making of joints in restricted locations.

 

f)                          Each metal pipe spigot shall be centered with three lightly wedged pieces of hardwood or folded lead.

 

g)                         The jointing surfaces shall be cleaned to remove any coatings or cutting oils, etc. 

 

 

10.0        CI (LA) PIPE AND FITTING:

 

10.1        Sump Pump discharge Pipe/Rain Water horizontal header/soil waste header running at Basement ceiling/Rain Water Pipe running underground shall be centrifugally cast [spun] iron pressure pipe {class LA] conforming to IS 1536:2001

 

10.2        Dimension, Standard weight shall be as follows

Nominal Diameter DN mm

Barial

Socket

Mass kg

Total for one working Length L in kg (Approved is Length)

DE

 mm

E mm

Mass

 for

1 Meter kg

3.66 m

4 m

4.5 m

5 m

5.5 m

80

98

7.2

14.7

5.5

59

64

72

79

87

100

118

7.5

18.6

7.1

75

82

91

100

109

125

144

7.9

24.2

9.2

97.8

106

118

130

142

150

170

8.3

30.1

11.5

122

132

147

162

177

200

222

9.2

44.0

16.8

178

193

215

237

259

250

274

10

59.0

22.9

240

260

290

319

349

300

326

10.8

76.5

29.8

310

336

374

412

450

350

378

11.7

96.3

37.5

390

423

471

519

567

 

 

10.3     Fitting for CI (LA) Pipe shall confirm to IS : 1538 – 1967 where possible  junction from branch pipe shall be made by a ‘Y’ Tee.

 

11.0      CLEAN OUT PLUGS :

 

11.1      Contractor shall provide cast brass clean out plugs as required. Clean out plugs shall be threaded and provided with key holes for opening. Clean out plugs shall be fixed to the pipe by a GI socket and lead caulked joint.

  

12.0      WASTE PIPE FROM APPLIANCES:     

 

12.1      Waste pipe from appliances e.g. washbasins, sinks and urinals etc. shall be of Galvanized-iron (GI) heavy duty (class ‘c’) conforming to IS: 1239 Part I as given in the Schedule of Quantities.

 

12.2      All pipes shall be fixed in gradient towards the outfalls of drains. Pipes inside a toilet room shall be in chase unless otherwise shown on drawings. Where required pipes may be run at ceiling level in suitable gradient and supported on structural clamps as directed by the Architect/Consultants. Spacing for the clamps shall be 3000mm for vertical runs and 2400mm for horizontal runs.

 

12.3      Pipes shall be galvanized steel tubes conforming to IS : 1239 (Heavy Class) and quality certificates shall be furnished. Pipes shall be provided with all required malleable fittings conforming to IS : 1879 e.g. tees, couplings, bends, elbows, unions, reducers, nipples, plugs etc. All GI waste pipes shall be terminated at the point of connection with the appliance with an outlet of suitable diameter. Pipes in chase shall be painted with two coats of black bitumestic paint and exposed pipes with one coat of red oxide primer and two or more coats of synthetic enamel paint or as given in the Schedule of Quantities.

 

                  TECHNICAL SPECIFICATION OF WC PAN CONNECTOR:

 

13.1              The WC pan connector shall be flexible/soft and shall be made of single body construction with integral fins, made from EVA (Ethgl vingl Acetate). The pan connector must confirm to BS 5627: 1984. The pan connector must be supplied with one seal made of TPE (Thermo plastic                Elastomeric). The pan connector must be supplied with factory fitted spring loaded seal guard.

13.2              The connector shall not be allowed to come in contact with mineral oil, grease, putty or any compound containing mineral oil or grease.

13.3              The pan connector must be stared away from direct sun light and flames.

13.4              FIXING:

The soil pipe must be reasonably clean and smooth an the diner surface, in case

             the soil piping is in C.I material then supplier supplied bush/adaptor shall be used.

    The connector socket is pushed fully home on to the pan spigot, the reafter the WC is placed in position gently pushing  the fitment to ensure that the connector end filts into the spigot of the pipe.

  The pan connector must be pushed in such an way as to ensure that the seats and fins turn inward to ensure proper sealing.

 

14.0      CEMENT CONCRETE:

             Cast iron soil and waste pipes under floor in sunken slabs and in wall chases (when cut specially for the pipe) shall be encased in cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 stone aggregate 12 mm size) 75 mm in bed and alround. When pipes are running well above the structural slab, the encased pipe shall be supported with suitable cement concrete pillars of required height at intervals of 1.8 m. 

 

15.0      PAINTING :

15.1      Soil, waste, vent and anti-siphonage pipes in any exposed location in shafts, pipe spaces etc. shall be painted with two coats of primer and two or more coats of synthetic enamel paint of colour as specified to given an even shade.

 

15.2      Pipes shall be painted with paint of approved quality and shade in accordance with approved pipe colour code.

 

15.3      GI waste pipes in chase shall be painted with two coats of bitumen paint. Exposed pipes shall be painted with two or more coats of synthetic enamel paint over two coats of etch primer.

 

15.4      CI soil and waste pipes below ground and those covered in cement concrete shall not be painted.

 

16.0      CUTTING AND MAKING GOOD HOLES/ CHASES :

 

16.1      Pipes shall be fixed and tested as the building work proceeds. Contractor shall provide all necessary holes, cut outs and chases in structural members as the building work proceeds. Wherever holes are cut or left originally, they shall be made good with cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 stone aggregated 20mm nominal size) or cement mortar 1 : 2 (1 cement : 2 coarse sand) as directed by the Architect/Consultants and the surface restored as in original condition to the entire satisfaction of the Architect/Consultants at no extra cost.

 

17.0      TESTING :

17.1      Testing shall be done in accordance with IS : 1172  and IS:5329 except as may be modified hereinunder.

 

17.2      Before use at site all CI pipes shall be tested by filling up with water for at least 30 minutes. After filling, pipes shall be struck with a hammer and inspected for blow holes and cracks. All defective pipes shall be rejected and removed from the site within 48 hours.

 

17.3       Soil and waste pipes shall be tested in sections after installation, by filling up the stack with water. All openings and connections shall be suitably plugged as approved by the Architect/Consultants. The total head in the stack shall be 4.5m at the highest point of the section under test. The period of test shall be two (2) hours minimum as directed by the Architect/Consultants. If any leakage is visible, the defective part of the work shall be cut out and made good.

 

17.4       The Contractor shall test all vent pipes by a smoke testing machine. Smoke shall be pumped into the stack after plugging all inlets and connections. The stack shall then be observed for leakages and all defective pipes and fittings removed or repaired as directed by the Architect/Consultants.

 

 

17.5       A test register shall be maintained and all entries signed and dated by Contractor and Architect/Consultants. A proforma of the proposed test register shall be submitted to the Architect/Consultants for approval.

 

17.6       All pipes in wall chase or meant to be chased or buried shall be hydro tested before the chase is plastered or the pipe encased or buried.

 

18.0          UPVC PIPES & FITTINGS:

 

18.1          UPVC PIPE AND FITTINGS FOR RAIN WATER DISPOSAL SYSTEM :

 

18.1.1      Rain water pipe shall be UPVC SWR Type A conforming to IS : 13592-1992.

 

18.1.2      Dimension of SWR Pipe Fittings shall be as per DIN 19531 and DIN 19534 and conforms to IS : 14735-1999.

 

Rubber ring shall be conforming to IS : 5382.

 

18.1.3      DIMENSION OF SWR PIPES CONFORMING TO IS : 13592-1992

 

S.No.

Nominal

Outside

diameter(D)

mm

Tolerance

Of

Outside

diameter

Wall Thickness –

Type A (t) mm

Wall Thickness –

Type B (t) mm

Min in

Max

Min

Max

1.

75

+0.3

1.8

2.2

3.2

3.8

2.

90

+0.4

1.9

2.3

3.2

3.8

3.

110

+0.4

2.2

2.7

3.2

3.8

4.

160

+0.5

3.2

3.8

4.0

4.6


S.No.

Size (mm)

Horizontal Support Distance (m)

Vertical Support

Distance (m)

1.

40

0.4

1.2

2.

50

0.5

1.5

3.

75

0.75

2.0

4.

110

1.1

2.0

5.

160

1.6

2.0

      







18.1.4  Maximum Support Distance in Meter :

 

18.1.5 Rubber ring shall be of make and type approved by Pipe and fitting manufacturer. Rubber ring joint shall be made in an approved manner as recommended by the manufacturer.

18.1.6 For testing, seal hermetically at all opening below the top of the section to be tested. The water level shall then be raised to a height of not less than 3m above the highest point of the section being tested or as the inspection offer may direct. Every joint shall be carefully examined for leaks.

19.1. TECHNICAL DETAIL :

[1]      Dimension of Un-plasticized PVC Pressure Pipes [Ring Fit/Ring Tight Rigid PVC Pipes [As per IS : 4985-2000].

 

     N    Nominal
outside
Dia    meter
(Nominal
S      Size)

 

Mean
Outside
 Diameter

WALL THICKNESS

Class 1
0.25 Mpa

Class 2
0.4 Mpa

Class 3
0.6 Mpa

Class 4
0.8 Mpa

Class 5
1.0 Mpa

Class 6
1.25 Mpa

Min

Max

Min

Max

Min

Max

Min

Max

Min

Max

Min

Max

Min

Max

      20

20.0

20.3

-

-

-

-

-

-

-

-

1.1

1.5

1.4

1.8

     25

25.0

25.3

-

-

-

-

-

-

1.2

1.6

1.4

1.8

1.7

2.1

     32

32.0

32.3

-

-

-

-

-

-

1.5

1.9

1.8

2.2

2.2

2.7

     40

40.0

40.3

-

-

-

-

1.4

1.8

1.8

2.2

2.2

2.7

2.8

3.3

     50

50.0

50.3

-

-

-

-

1.7

2.1

2.3

2.8

2.8

3.3

3.4

4.0

    63

63.0

63.3

-

-

1.5

1.9

2.2

2.7

2.8

3.3

3.5

4.1

4.3

5.0

     75

75.0

75.3

-

-

1.8

2.2

2.6

3.1

3.4

4.0

4.2

4.9

5.1

5.9

          90

90.0

90.3

1.3

1.7

2.1

2.6

3.1

3.7

4.0

4.6

5.0

5.7

6.1

7.1

1      10

110.0

110.4

1.6

2.0

2.5

3.0

3.7

4.3

4.9

5.6

6.1

7.1

7.5

8.7

1     25

125.0

125.4

1.8

2.2

2.9

3.4

4.3

5.0

5.6

6.4

6.9

8.0

8.5

9.8

1        40

140.0

140.5

2.0

2.4

3.2

3.8

4.8

5.5

6.3

7.3

7.7

8.9

9.5

11.0

160

160.0

160.5

2.3

2.8

3.7

4.3

5.4

6.2

7.2

8.3

8.8

10.2

10.9

12.6

180

180.0

180.6

2.6

3.1

4.2

4.9

6.1

7.1

8.0

9.2

9.9

11.4

12.2

14.1

200

200.0

200.6

2.9

3.4

4.6

5.3

6.8

7.9

8.9

10.3

11.0

12.7

13.6

15.7

225

225.0

225.7

3.3

3.9

5.2

6.0

7.6

8.8

10.0

11.5

12.4

14.3

15.3

17.6

250

250.0

250.8

3.6

4.2

5.7

6.5

8.5

9.8

11.2

12.9

13.8

15.9

17.0

19.6

280

280.0

280.9

4.1

4.8

6.4

7.4

9.5

11.0

12.5

14.4

15.4

17.8

19.0

21.9

315

315.0

316.0

4.6

5.3

7.2

8.3

10.7

12.4

14.0

16.1

17.3

19.9

21.4

24.7

355

355.0

356.1

5.1

5.9

8.1

9.4

12.0

13.8

15.8

18.2

19.6

22.6

24.1

27.8

400

400.0

401.2

5.8

6.7

9.1

10.5

13.5

15.6

17.8

20.5

22.0

25.3

27.2

31.3

 

Notes :

1.               The table is based on metric series of pipe dimension given in ISO 161/1 in respect of pipe dimensions and ISO DIS 4422.

2.               The wall thickness of pipe is based on a safe working stress of 8.6 MPa at 27oC. The working pressure gets reduced at sustained higher temperatures. Occasional rise in temperature, as in summer, with concurrent corresponding reduction in temperature during nights has no deleterious effect on the working pressure of the pipes considering the total life of pipe.

20.0           MEASUREMENT AND RATES :

20.1       General :

 

Rates for all items shall be inclusive of all work and items called for in the specifications given above and the Schedule of Quantities as applicable for the work under floors, in shafts or at ceiling level at all heights and depths.

All rates are inclusive of cutting holes and chases in RCC and masonry work  and making good the same.

 

All rates are inclusive of pre testing at site and final testing of the installations, materials and commissioning.

 

20.2       Pipes :

 

a)                      The unit of measurement shall be linear metre to the nearest centimetre.

 

b)                      All UPVC & CI soil, waste, vent, anti-siphon age and rain water pipes, AHU Drainage & sump riser shall be measured net, when fixed correct to a centimetre, including all fittings along their length after fixing. The length shall be taken along center line of the pipes and fittings. No allowance shall be made for the portions of pipe lengths entering the sockets of the adjacent pipes or fittings. The above shall apply to all cases i.e. whether pipes are fixed on wall face or pillars or embedded in masonry or pipes running at ceiling level. The quoted rate shall include lead jointing.

 

c)                 GI pipes shall be measured in running metre correct to a centimeter for the finished work which shall include fittings e.g. bends, tees, elbows, reducers, crosses, sockets, nipples, nuts, unions etc. The length shall be taken along center line of the pipes and fittings. All pipes and fittings shall be classified according to their diameter, method of jointing and fixing substance, quality and finish. The diameters shall be nominal diameter of internal bore. In case of fittings of unequal bore, the largest bore shall be considered.

 

20.3    Cement concrete around pipes shall be measured along the center of the pipe line measured per linear metre and include any masonry supports, shuttering and centering, curing, cutting etc. complete as described in the relevant specifications.

 

20.4    Slotted angles/ channels shall be measured per linear metre of finished length and shall include support bolts and nuts, length embedded in the cement concrete blocks of 1 : 2 : 4 (1 cement : 2 coarse sand : 4 stone aggregate 20mm nominal size) formed in the masonry walls; nothing extra shall be paid for the cement concrete block and making good the masonry wall, anchor fastners etc. complete.

 

20.5    Unit of measurement shall be the number of pieces. All urinal traps, trap gratings, hoppers, clean out plugs shall be measured by number and shall include all items described in the relevant specifications and Schedule of Quantities. Cockroach traps shall not be measured separately and are deemed to be included in the rate for traps. 

 

20.6    Painting of pipes shall be measured per running metre for each diameter of pipe and shall be inclusive of all fittings and clamp. No deduction shall be made for fittings.


 