1 GENERAL
1.1
Introduction
Cairn India Limited (CIL) is the Operator, on behalf of the Cairn
Energy and ONGC Joint Venture, of
Contract Area RJ-ON-90/1 in the State of Rajasthan, North-West India.
The RJ-ON-90/1 Production Sharing Contract (PSC) was executed
between the Government of India, ONGC and Shell India Production and
Development (SIPD) on May 1995.
Cairn group gradually farmed into the block in three stages, until
establishing the above mentioned Contractor under the PSC with respect to the
Development Area.
The Development Area, as defined in the Declaration of Commerciality
(DoC) includes four fields: Mangala, Aishwariya, Saraswati and Raageshwari Oil.
For development purposes the Development Area has been
divided into the Northern Fields and
the Southern Fields. Mangala and Aishwariya fields are Northern Fields
and Saraswati and Raageshwari Oil are Southern Fields. The Boundary Conditions
given by the Project Board cover the
development of Northern Fields and the Raageshwari Deep Gas Field (which will
be utilized to provide gas for consumption as
fuel).
Bhagyam and Shakti fields (also located at the north of the area) are subsequent discoveries and have separate development areas.
The scope of the Mangala Field Development Project
involves the Mangala Process Terminal and
its component parts inclusive of facilities associated with the
Raageshwari Deep Gas Field and the Thumbli Water Field (for supply of
injection/circulation water).
The basis of developing additional fields is that where
possible the Mangala facilities infrastructure will be utilized. The Mangala
facilities design will where possible be expanded to accommodate growth; this will
be done by adding new equipment to support the new field.
Development strategy is also premised on maintaining the
ability to tie-in southern fields, such as Saraswati and Raageshwari, or other
new finds as discovered and appraised.
Technical Integrity of the new facilities is one key
aspect that requires the attention of all the members of the project. Project
objectives can only be achieved by means of the compliance with applicable
requirements (technical and regulatory); from the development appraisal
drilling and conceptual design through to the
operation.
This Project Quality Plan (in line with Cairn India
corporate guidelines and the Project Execution Plan) shall be used as a powerful
tool for Quality Assurance and Project Technical Integrity. The quality failures result in safety and
environmental risks, exceed project
cost, schedule estimates and higher
operating costs during the lifecycle of the facilities. .
The Project Quality Management shall be able to control
all aspects affecting project quality, which orientates the same to a
reduction, elimination and, most importantly, prevention of quality deficiencies. Prevention implies the
identification and elimination of non-conformities before they affect project
quality, safety, budget, schedule or operability.
The following Project Quality Plan documents the Quality
Management System to be used in the Rajasthan Northern Area Development
Project, describing its elements and critical
activities, defining controls
required to ensure the achievement of the project quality objectives
and delegating technical and
administrative authorities throughout the same.
1.1
Purpose
The purpose of the Project Quality Plan is to apply Cairn’s
QMS to the Rajasthan Northern Area Development Project and to provide means by
which project management shall derive confidence that the Project is being
executed in accordance with the statutory, regulatory and/or stakeholders’
requirements.
The Project Quality Plan will be supported by the Key
Quality Activities Matrix (DECO-RX-Q-PLN- 0101), which will be used to
facilitate implementation of the Project QMS. The Matrix will define the
key quality activities, procedures, responsibilities
etc, for the Rajasthan Northern Development Projects.
This Project Quality Plan is a live document and as such
will be periodically reviewed and/or
changed in line with identified, agreed amendments and improvements to the
Project QMS during the course of the
Project. The Project Quality Plan will also be reviewed and updated to
accommodate any additions, deletions or changes to the contracted scope of work.
This Project Quality Plan is supported by the individual
quality plans of the contractors, subcontractors, suppliers and sub-suppliers,
in accordance with the document Quality Assurance Requirement Contractors
(DECO-RX-Q-SP-0001). The supporting plans, will be reviewed by the Project QA
Manager for alignment and compliance with the Project QMS requirements.
1.2
Scope
The scope of the Project Quality Plan covers all the
quality related activities within the scope of the Mangala
Field Development Project associated with permanent installations from
project kick-off to final completion.
The Plan involves all Cairn India personnel assigned to
the Project and the associated resources
and facilities employed. The key Project Personnel identified in section
5.5.1 of the Plan will ensure its implementation.
Likewise, the Plan applies to all Cairn India suppliers,
sub-supplier, contractors and subcontractors who shall be required to comply
with the Project QMS.
This plan will be fully applied to following primary activities:
-
Design and Detail
Engineering.
-
Procurement including inviting bids
for equipment, services and subcontracts, performing bid evaluations, Invitation to Tender
(ITTs), placing procurement contracts, expediting.
-
Quality Surveillance of Suppliers, Sub-suppliers and Sub-contractors.
-
Site Construction activities,
including construction management, fabrication, QA/QC, Safety, placing
subcontracts.
-
Pre-Commissioning, Commissioning, and Start-up.
-
Handover.
-
Operations / Maintenance Training.
1.3
Issue and distribution
The Project Quality Plan will be made available
electronically, on ‘read only’ basis, on the project data base.
The “controlled” hard copies of Project Quality Plan
will be issued by the Project Quality Manager to authorised project personnel
who shall be held responsible for its implementation and update within their
functions. These authorised project personnel will be responsible for reporting
to Project Management any deficiencies or problems and will suggest
improvements resulting from the use of the Project Quality Plan and related
procedures.
The hard copy of PQP requested by third parties or other
Cairn departments shall be formally transmitted via the Project Document
Controller who shall retain records of recipients.
All other hard copies, including those down-loaded from
the data base, shall be deemed to be “uncontrolled”.
1.4
Revisions
The Project Quality Assurance Manager will update and
revise the Project Quality Plan whenever changes, additions or deletions are
found to be necessary.
When a revision to the text results
in a change, addition or deletion, the area of the current revision shall be
identified in the left hand margin of the page adjacent to
where the
change/addition/deletion was made. All previous revision identification shall
be removed.
1.5
Integration with other
Management Systems
The Project recognises the similarities between Quality,
Safety, Health, Environmental and other management systems and shall ensure
that integration of key quality
management system activities with those other systems is
achieved without conflict or duplication.
With regards to Cairn’s Integrity Management System
(IMS), currently under development on a corporate level, the Project QMS will
be considered part of the IMS (section 7.0 “Programs”, tier 4) and gradually
will be adopting the corporate guidelines that are being prepared for Project
implementation once they are adequately approved. It is worth to mention that
the IMS will be the base management of Cairn’s quality aspects by means of a
Quality Programme following the principles of the international standards used
as a reference for defining the Project QMS (mainly ISO/TS 29001 and ISO 9001).
1.6
Cairn Gated Process
The Cairn Gated Process (CGP) provides an overall
framework for project management which
allows systematic appraisal and decision-making with respect to the
readiness of the project to proceed from one project phase into the next phase.
The CGP is a key part of Cairn’s business investment process providing a
structured and integrated approach for analysing investment
options, capital efficiency, value optimization and asset monetisation.
The CGP has defined Decision Gates (DG) at the end of
each project phase. At these gates the Gatekeeper, in conjunction with the
Project Board, shall assure that the defined deliverables have been
produced and thereby ready to move into the next stage.
The purpose of the Decision Gates is to
provide a clear framework and timelines for Management interventions, support
to effective early decision making and
better capital planning.
The CGP is a six stage process and it is related with
the Project Management System as illustrated
in the Attachment 1. Section 7.1.1 (Project Processes and Interfaces)
also provides a CGP approach of the QMS.
2 REFERENCES
The contents of this Project Quality Plan are based on, or interface
with, the applicable requirements of the following documents:
-
Petroleum, petrochemical and
natural gas industries – Sector-specific Quality Management Systems – Requirements for product and service supply organizations, ISO/TS 29001:2003.
-
Quality Management System – Requirements, ISO 9001:2000.
-
Quality Management Systems – Guidelines for Quality
Plans, ISO 10005:2005.
-
Quality Management Systems –
Guidelines for Quality Management in Projects, ISO 10006:2003.
-
Guidelines for Quality and/or environmental management systems auditing, ISO 19011:2002.
-
Mangala Field Project Execution Plan, DECO-MRX-PM-PEP-0001.
-
Stage Deliverables & Passage Details, DECO-RX-PM-SCH-8000.
-
CEIL Quality Management Procedures and Policies, DECO-RX-Q-PRO-0021.
-
Project Engineering Execution Philosophy, DECO-MRX-J-SDP-0100.
-
HSE Management System Manual, DECO-RX-R-MAN-0100.
-
Contract Execution Plan, DECO-RX-PM-PEP-2001.
2.1
Terms and Definitions
For the purposes of this Project Quality Plan and
supporting procedures the terms and definitions given in ISO 9001 and ISO/TS
29001 (latest revisions) shall apply and prevail, however, in order to
facilitate the understanding of the same some adaptations were made as follows:
TERMS |
DEFINITIONS |
Cairn |
Cairn
India Ltd |
Project |
Rajasthan
Northern Area Development Project |
Quality |
Degree
to which a set of inherent characteristics fulfils requirements. |
Quality Management |
Coordinated activities to direct and control an organization with
regard to quality.
NOTE
Direction and control with regard to quality generally includes establishment of the
quality policy and
quality objectives, quality planning, quality control, quality assurance and quality improvement. |
TERMS |
DEFINITIONS |
Quality Assurance |
Part of quality management focused on providing confidence that quality
requirements will be fulfilled. |
Quality Control |
Part of quality
management focused on fulfilling quality
requirements on product. |
Quality Management System (QMS) |
Management system to direct and control an organization with regard to quality. |
Quality Plan |
Document specifying which procedures and associated
resources shall be applied by whom and when
to a specific project, product, process or contract. NOTE 1 These procedures generally
include those referring to quality management processes and to product realization processes. NOTE 2 A quality plan often makes
reference to parts
of the quality
manual or to procedure documents. NOTE 3 A quality plan is generally one of the results of quality planning. |
Quality
Control Activity Plan (Key Activity Matrix) |
A key document which supports the
Project Quality Plan and lists
in a logical sequence key activities such as contract review, engineering, procurement, etc. It identifies
individual activities, controlling procedures/ standards, verifying
documentation and method by which compliance is assured (i.e. audit). |
Inspection and Test Plan |
A document relating to purchased / subcontracted
products and services which lists in a logical
sequence key activities such as purchase order review,
manufacturing, construction, inspection, test and verification activities. It
identifies individual activities, controlling procedures / standards,
characteristics to be verified, acceptance criteria, verifying documentation,
inspection and test requirements, etc. |
Quality Audit |
Systematic, independent and documented process for obtaining
audit evidence and evaluating it objectively to determine the extent to which audit criteria are fulfilled.
NOTE Internal audits, sometimes called first-party audits,
are conducted by, or
on behalf of, the organization itself for internal purposes and can form the
basis for an organization’s self-declaration of conformity. External audits include what are generally termed “second-” or “third-party
audits”. Second-party audits are conducted by parties having
an interest in the
organization, such as customers, or by other
persons on their
behalf. Third-party audits are
conducted by external independent organizations. Such organizations provide
certification or registration of conformity with requirements such as those
of ISO 9001
and ISO 14001. When quality and
environmental management systems are audited together, this is termed a “combined audit”. When two or more auditing organizations cooperate to audit a single auditee jointly, this is termed “joint audit”. |
TERMS |
DEFINITIONS |
Supplier |
Organization
or person that provides a product. |
Product |
Result
of a process. NOTE 1 There are four generic product categories, as follows: — services (e.g. transport); — software (e.g. computer program, dictionary); — hardware (e.g. engine mechanical part); —
processed materials (e.g. lubricant). |
Quality Policy |
Overall intentions and direction of an organization related to quality as formally expressed by top
management. |
Process |
Set of interrelated
or interacting activities which transform inputs into outputs. NOTE 1 Inputs to a process are generally outputs of other processes. NOTE 2 Processes in an organization are generally planned and carried out under controlled conditions to add value. NOTE 3 A process where the conformity of the resulting product cannot be readily or economically verified is frequently referred to as a “special process”. |
Customer |
Organization
or person that receives a product. EXAMPLE
Consumer, client, end-user, retailer, beneficiary and
purchaser. NOTE A customer can be internal or
external to the organization. |
Acceptance criteria |
Specified
limits of acceptability applied to process or product. Characteristics. |
Calibration |
Comparison and adjustment to a standard of known
accuracy. |
Control feature |
Organization’s documented method to perform an
activity under controlled conditions to achieve
conformity to specified requirements. |
Delivery |
Point in time
and physical location at which the agreed transfer of ownership takes place. |
Design acceptance criteria |
Defined
limits placed on characteristics of materials, products, or services established by the
organization, customer, and/or applicable specifications to achieve conformity to the product design. |
Design validation |
Process of proving a design by testing to demonstrate conformity of the product to
design requirements. |
Design verification |
Process
of examining the result of a given design or development activity to determine conformity with specified requirements |
Manufacturing
acceptance
criteria |
Defined limits placed on characteristics of materials, products, and services
established by the
organization to achieve conformity to the
manufacturing or service requirements. |
Special process |
Process where the conformity of the resulting product cannot be readily or economically verified by subsequent monitoring or measurement. |
Tender |
Offer
made by an organization in response to an invitation to provide a product. |
3 PROJECT SCOPE OF WORK
3.1
General
3.1.1 Mangala & Raageshwari Fields
As previously mentioned in this document, the scope of
the Mangala Field Development Project consists in developing the Mangala Field which mainly involve
the Mangala Process
Terminal (MPT) same as other facilities associated with the Raageshwari Deep Gas Field (for supply
of fuel gas) and the Thumbli Water Field (for
supply of injection/circulation water). Future infrastructure and facilities expansions enabling tie-ins
with the other fields are expected.
The surface facilities for the Mangala field and the
Raageshwari gas field will contain the following elements:
-
Well Pads
-
Mangala Process Terminal (MPT)
-
In-field Pipelines
-
Infrastructure Facilities
-
Interconnecting roads with corridors for pipeline, electrical and communication cabling,
etc.
The production facilities can simply be defined in the
following stages: wells, fluid
gathering, oil/water separation,
storage and export. In addition, there will be supporting utilities,
including power generation, and safety
systems.
The separated associated gas will be used, after
treatment, as fuel for power and heat. This will be supplemented with imported
gas from the Raageshwari Gas Field.
Oil production from Mangala will be routed to the tank
farm located within the MPT. It is expected
that production from the future development of the other Northern fields
will also be routed to the tank farm.
The oil voidage make-up water, required for injection
support, will be sourced to the south of the Mangala Field from the Thumbli Water Field. This water will
also be utilised to provide plant water.
Facilities for the Mangala processing terminal (MPT) are as follows:
-
Gas separation
-
Heating
-
Water removal (settling tank/electrostatic coalescer
/ desalter)
-
Make-up water transfer/reception
-
Water treatment
-
Water injection
-
Power water treatment and distribution (for jet pumps)
-
Fuel gas treatment/compression
-
Fuel oil treatment
-
Utilities
3.1.2 Bhagyam Field
The Bhagyam field should be considered a “satellite” field to
Mangala aimed to maximize synergy
with the Mangala development. Additional studies are
required to select the concept and define integration to Mangala.
Current assumption is that Bhagyam Filed shall be
provided with independent facilities and shall produce oil meeting export
specifications which will be pumped to the MPT’s Tank Farm.
3.1.3 Shakti Field
Shakti is located approximately 10 km north of Mangala.
It is a marginal field and should be developed
accordingly.
The feasibility case envisaged Shakti surface facilities
producing from “multi-well” well pads and processing the oil to a specification
for transportation and further processing at Mangala. The associated gas would
be used for local power generation, augmented by a power supply from the
Mangala development.
3.1.4 Aishwariya Field
Aishwariya Field involves crude with high CO2. Additional studies are required to
select the optimum concept for the exploitation of this field.
3.2
Detailed Scopes
Detail Engineering and Design scope of work is mainly
described in document DECO-RX-PM- SOW-0043 “Statement of Requirements and Basis
of Design”, covering the surface facilities
between the downstream chokes on the wellheads and the custody transfer
point which is the downstream flange on the metering facility.
For the Engineering and Procurement Stage, contract number RJ6CA000006 (Detail
Engineering for Mangala &
Raageshwari Gas Development Project) clearly details the scope of work
requirements that the Engineering Contractor will perform for the Mangala Oil
Field and associated facilities.
For the Construction Stage of the Project, Document DECO-RX-PM-SOW-0100
“Scopes of Work Document”, details the scope of works requirements that the
Main Contractor, as per the Project Contracting Strategy (Constructor camp,
Mechanical and Structural, Pipelines, Electrical, Instrumentation and
Telecommunications), will perform for the Mangala Oil Field and associated
facilities.
The elements that collectively make up the Main Contractor’s Scope
of work are:
-
DECO-RX-PM-SOW-2004, Constructors Camp;
-
DECO-RX-PM-SOW-2005, Electrical, Instrumentation and
Telecomm (E,I &T);
-
DECO-RX-PM-SOW-2001, Mechanical and Structural Works;
-
DECO-RX-PM-SOW-2003, Pipelines;
Additionally (and independently) to the Main Contractor
Scopes of Work, there will be other scopes
of work required:
-
DECO-RX-PM-SOW-2000, Civil Works;
-
Drilling and Completion Scope of Work;
-
OPS BASE Scope of Work;
-
Integrated Control Systems (ICS), Scope of work;
-
Freight Forwarder Scope of Work; and
-
Green Belt Scope of
Work.
All activities associated with the Project shall be performed
and monitored in accordance with the requirements of ISO/TS 29001 as deployed
through the Project Quality Assurance Manual (CAIRN- RX-IMS-PRO-0701).
4 PROJECT QUALITY MANAGEMENT SYSTEM
4.1
General Requirements
The Project Quality Plan (hereafter referred to as
“PQP”) is the main Project’s quality document for defining the Quality
Management System (QMS) elements required to be implemented and maintained in
order to ensure and demonstrate that all the processes and activities within
Project’s scope, carried out under the control of Cairn India Ltd, conforms to
the specified requirements. The PQP also describes the project organization,
responsibilities and authorities for implementation of the QMS.
By means of this PQP, the Project evidences (or
addresses into a more specific/detail document) the way it:
-
identifies the processes
needed for the quality management
system, their application throughout the organization, and their sequence
and interaction (see Attachment 1, “Project Process
Sequence and Interaction Map”),
-
determines the criteria and methods needed
to ensure that both the operation and control of these processes are effective.
-
ensures the availability of
resources and information necessary to
support the operation
and monitoring of these processes,
-
monitors, measures and analyzes these processes, and
-
implements
actions necessary to achieve planned
results and continual improvement of these processes.
All these processes are managed by the Project in accordance
with the requirements of this PQP in order to meet the requirements of ISO/TS
29001, Cairn India Corporate Policies, and other industry codes, standards
and/or specifications as identified by particular requirements.
Cairn India acts as a project governance organization
that plans and controls the Development of Fields, Wells and Surface
Facilities, through contracted engineering, procurement, installation and
construction firms and the appointment of a Project Specific Organisation.
In this sense, any outsourced process affecting project
conformity with requirements, is properly controlled in accordance to section
7.4 (Purchasing) of this PQP an applicable Project Procedures established for
managing interfaces with Vendors and Contractors as per their own scope of work
(i.e. Engineering and Design, Fabrication, Construction, etc).
All Project vendors and contractors are imposed with the
responsibility for operating their own
Quality Management Systems in order to achieve the specified project quality requirements.
4.2
Technical Integrity
The Project initiates the achievement of Technical
Integrity by defining in objective terms (technical deliverables) the design
intent for plant and equipment to provide safe operation.
“Technical Integrity … includes the processes and
competencies required to ensure that the communication and development of that
design intent through specification, procurement, detail design, fabrication,
erection, and testing match the original intent
and intended use”. “Technical integrity will only be maintained by the competent operation of the completed facilities within the design envelope and design intent, and with the application of operational integrity assurance systems”.
In this sense, the Quality Function appointed for the
Project provides the required support in order to match the design intent with the final
result of the developed facilities, by means of the implementation of the Project
Quality Management System (QMS) as per defined in this PQP.
1st level
Document - Project Quality Policy (Project Quality Statement)
The Project keeps aligned with Cairn India’s corporate
principles that govern its activities in quality matters.
The Project Quality Statement is the document that:
enunciates the main quality principles to be followed, evidences the top
management commitment in this matter and; clearly assigns the responsibility of
its fulfilment to all the Project employees (see Attachment 2).
Each one of the principles contained in the Project
Quality Statement responds to one specific consideration regarding third
parties (stakeholders) or our employees, within the frame of the processes and
business activities developed by Cairn India Ltd.
2nd level
Document – Project Quality Plan and Key Quality Activities Matrix
The Project Quality Plan is the most important document
of the Project Quality Management
System and is based on the requirements of ISO/TS 29001 (latest
revision) and the IMS Quality Assurance Manual applicable for all Cairn’s
projects (CAIRN-RX-IMS-PRO-0701). The objective of the PQP is to implement a
system of control so that systems, components, structures etc., are designed,
procured, manufactured and constructed in accordance with the applicable
contract requirements, codes, specifications and drawings.
The Project Quality Plan provides the
baseline to be developed and utilised by each of the major contractors,
suppliers and subcontractors on their individual quality plans content.
The Key Quality Activities Matrix (DECO-RX-Q-PLN-0101),
shall be issued as a supporting document
to the Project Quality Plan. This document tabulates the activities and
identifies the controlling procedures in order to describe in detail the
quality activities to be executed for the compliance with Project requirements.
The Key Quality Activities Matrix will also provide an
interface to key activities relating to subcontracted scopes of work.
3rd level Documents –
Control Procedures
These control procedures are those which are identified
within the PQP and the Key Quality
Activities Matrix. It is the intention of the Project to utilise as far
as possible those procedures which are Cairn standard. Where necessary,
existing procedures shall be amended, or new versions developed, to take
cognisance of those business processes which may be specific to the project.
Co-ordination procedures shall also be developed as necessary to address those
systems and business processes which shall be common across the project, e.g.
document control, cost reporting, etc.
Contractors, suppliers and Sub-contractors procedures
shall be identified within their own individual quality plans.
4th level Documents -
Inspection and Test Plans and Records
Inspection and Test Plans (also referred to as Quality
Control Plans) shall be developed as
required by Cairn to cover specific products, services or scopes of
work. The Inspection and Test Plans (ITPs) shall identify the quality related
activities, the controlling procedure/ specification/drawing, the acceptance
criteria, verifying documentation and inspection and surveillance requirements.
The requirements of such Inspection and Test Plans shall
relate to the criticality rating of the purchased/subcontracted product or
scope of work as per document DECO-RX-Q-SP-0100 “Equipment Criticality and
QA/QC Surveillance”.
An ITP template is included on attachment 7.
1.1
Control of Documents and Data
Document and Data pertaining to this project are initially
controlled in accordance with Cairn’s procedures:
DECO-RX-PM-PRO-0005 “Detail Design & Engineering Team – Document
Control Procedure”, DECO-RX-PM-PRO-0002 “Project Numbering System”, and
DECO-RX-PM-PRO-0003 “Requirement for the Delivery of Supplier
Documentation and Data.
During the Detail Engineering and Design Phase of the
Project, applicable project specific procedures prepared by the Engineering
Contractor and agreed by Cairn are implemented, also using contractor’s Project
Document and Material Control System (PDMC) for primary control. The above
mentioned procedures are given below:
DECO-RX-PM-PRO-2006 “Transmittals”,
DECO-RX-PM-PRO-2007 “Project Distribution Charts”.
DECO-RX-PM-PRO-2014 “Engineering Document Control”, DECO-RX-PM-PRO-2021 “Vendor
Data Processing”,
By means of both type of procedures it shall be ensured
that all correspondence, drawings and technical data received or generated by
the Project during the Detail
Engineering and Design Phase (for every revision) are receipt,
recorded, issue, distributed, filed and stored in an efficient and controlled manner, including both
e-files and hard (paper) copy files.
1.1.1 Distribution of Project Documentation
Project documentation is distributed to project team
members in accordance with the Distribution Chart shown in document
DECO-RX-PC-CHA-2001.
1.1.2 Document Electronic Management Tools
The electronic management tool “Documentum™” will be
used in the project in order to have a “seamless hand over” of electronic
project deliverables to Cairn Operations.
Cairn’s Detail Design & Engineering Team will only
use Documentum™ to search for project documents and this is to be done via “Web
Client”.
Simultaneously, as previously mentioned the Engineering
Contractor has selected “PDMC tools”
and Citadon software for the control and management of project documents.
PDMC & Citadon are capable for storage &
retrieval of electronic documents, tracking, redline/markup for comments to
engineering and vendor documents. Project engineering team shall use these
tools for their day to day operations.
Complete list of project deliverables for the Detail
Engineering and Design Phase of the Project is shown in the document
DECO-MRX-PM-DCR-2100 “Master Document Register”, which is available in
electronic (excel type) format.
1.2
Control of Records
The objective for establishing and maintaining the
records is to provide evidence of the conformity to requirements and of the effective
operation of the Project QMS.
By means of the Quality Records the
Project can demonstrate that activities have been performed and that the
desired results have been obtained.
For the Detail Engineering and Design activities,
Project Records are maintained according to the general guidelines described in
the procedure "Project Records Management" DECO-RX-PM-PRO- 2011.
Each project procedure defines the required quality
records for a particular Project process. Project Personnel and especially
functional heads are responsible for ensuring the collection, registration and
systematic maintenance of Quality Records within the scope of their
responsibilities.
The Project quality records shall be properly identified
for the related project or service, readily accessible and stored in an
adequate environment in order to prevent damage, deterioration or losses. They
can be in hard copy or electronic format. These records may include those
obtained from external sources.
During the Construction phase of the Project, the
Quality Control (QC) Inspectors from all the disciplines (Civil, Mechanical,
Piping, Pipelines, Electrical, Instrumentation
and Telecommunications) shall
daily collect the ongoing Inspection and Test Records (ITRs) generated once the Inspection and Testing activities took place, as per the Contractor approved
ITP.
Certification of Construction phases will be coordinated
with the appropriate release of systems and subsystems once all the ITRs
defined for such systems/subsystems are properly filled out and signed off by the QC Inspectors and
Construction Supervisors from both parties (Cairn and the Construction
Contractor), agreeing the construction conformance of the particular system or
subsystem to design specifications.
Vendors and Construction Contractors will develop a
Fabrication / Construction Data Book as per their particular Scope of Work.
Document DECO-RX-PM-PRO-0003 includes a general description of the Data Book Content. Lead Discipline
Engineers and the Project Quality Manager shall review and approve the specific
content of every data book to be submitted.
2 MANAGEMENT RESPONSIBILITY
2.1
Management Commitment
Project Management evidences its commitment with
developing and continuously improving the Project QMS and its effectiveness by
the following means:
a.
Communicating to
the organization the importance of meeting stakeholders as well as
statutory and regulatory requirements by documenting and approving the Project
Execution Plan (PEP, DECO-MRX-PM-PEP-0001) and the Project
Quality Plan (PQP, DECO-RX-Q-PLN-0100),
b. Establishing the Project Quality
Statement and the Project Quality Objectives,
c. Conducting Management Reviews (as per section 5.6.1 “Management Review”), and
d. Ensuring the availability of resources (as
per section 6 “Resource
Management”).
2.2
Customer focus
For the Project, the stakeholders are customers, who have a
particular interest in the Fields’ Development including but not limited to:
-
Cairn India Limited
(Corporate)
-
Strategic Partnerships
-
Field owners
-
The government of India and its
entities (ministries, institutions, etc), including Rajasthan authorities.
-
Rajasthan communities.
The Project Manager and the Project Quality Assurance
Manager shall ensure that the stakeholder requirements are determined and met
with the aim of enhancing customer satisfaction. In order to achieve this,
interfaces with Cairn India Corporate shall be ensured in both levels: through
the Project Manager and functionally
through the corresponding corporate departments (i.e. Corporate Quality
Department and Project Quality function).
The project requirements to be met as specified in
Project Execution Plan DECO-MRX-PM-PEP- 0001, and the applicable Indian
Government regulations (including environmental and safety regulations as per
document DECO-RX-PM-SOW-0024 “Regulatory Requirements and Approvals/Consents”).
The design requirements to be met and latterly
maintained during the procurement and
construction of the facilities. These requirements are mainly determined
and recorded by means of document DECO-RX-PM-SOW-0043 (Statement of
Requirements and Basis of Design) which “provides the Basis of Design (BOD) for
Detailed Design, together with the
requirements to be met in the design of
the surface facilities for the Mangala Field
Development”.
2.3
Project Quality Statement
Please refer to
Attachment 2.
2.4
Quality Planning
Project Quality
Planning includes:
· Establishing the
Project Quality Objectives at relevant functions and levels within the Project
Organisation, and
· Planning the
Project QMS in order to meet the requirements of the ISO/TS 29001 and the
Quality Objectives.
The
Project Quality Assurance Manager shall ensure that the integrity of the
Project QMS is maintained when changes to the QMS are planned and implemented.
2.4.1 Project Quality Objectives
The Quality objectives, derived from the quality statement, for the
Mangala Field Development Project are as detailed below:
-
To assign facilities that are safe,
environmentally acceptable, cost effective, meet all applicable standards,
contractual and regulatory requirements.
-
To carry out the work in time, correctly, with
minimum occurrence of errors and rework.
-
To establish a Quality Management
System to deliver the required standard of workmanship in accordance with ISO /
TS 29001 (latest revision).
To achieve
these objectives, the Project mainly will implement the following:
-
Procedures to assure that key work
processes and quality requirements are clearly defined and documented.
-
A continuous QA auditing process in order to improve the Project
Quality Management System.
-
Orientation and Team Building
Programs involving all Project personnel to
ensure understanding and
achievement of the Project objectives.
-
Technical Audits to evaluate the
adequacy and effectiveness of the Project control systems as required.
-
Continuous monitoring of Vendors
and Contractors quality performance as per project QMS requirements.
-
Tracking of action status of
“assurance events”, such as HAZOP, QRA, PHSER and Technical Audits, as defined
in document DECO-RX-Q-PLN-0101 “Key Activities
Matrix”.
Project Performance Indicators based on the above mentioned
objectives will be established and continuously monitored and analysed as per
section 8.4.
2.4.2 Project QMS Planning
As part of this PQP (which is better described in section 7.1), the
Project QMS establishes the following additional Planning Requirements:
-
Establishing the intervals for conducting the
Management Reviews (as per section 5.6)
-
Establishing the methods for
translating product requirements provided from external sources into the
project realization processes (as per section
7.1.1).
-
Design Planning (as per section 7.3.1).
-
Construction and Inspection and Testing Planning (as
per section 7.5.1).
-
Monitoring, Measurement, Analysis and Improvement
Planning (as per section 8.1)
-
Internal Audit Planning (as per section 8.2.2).
2.5
Responsibility, Authority and
Internal Communication
2.5.1 Responsibility and authority
Responsibility and authority for all personnel is defined by their
job descriptions. Job descriptions shall include the following as a minimum:
-
Function description.
-
Responsibilities, including for safety and quality.
-
Accountability.
Each key Project team member shall hold or have access
to a copy of his/her job description. The responsible manager for each area
shall also hold or have access to relevant copies. The project data base shall
contain those job descriptions applicable to Cairn staff. Non-Cairn staff shall
work according to the requirements of their respective management systems which
are required to comply with the Project QMS.
Key Project Team Members with regards to quality and
their main responsibilities are listed as
follow:
2.5.2 Project Manager
The Project Manager is the Company Representative and he reports to
the Head of Engineering. His main responsibilities include:
·
Overall responsibility for the safely execution of
the project to budget, schedule, safety and required quality.
·
Overall Project strategy,
direction and performance per Cairn India Ltd. requirements.
·
Establishment, implementation and maintenance of the
project QMS.
·
Identify training needs in consultation with
functional heads and coordinate with appropriate sections for fulfilling the
training requirements.
·
Delegation of authority and
implementation of the project QMS to members of
the Project Development Team as appropriate
to their particular functions.
·
Implementing remedial and/or corrective action on
matters affecting Quality and Project performance.
·
Provide adequate resources to all the sections
concerned to comply with requirements
of the project.
·
Maintain smooth functioning of site execution and
sub-contracts through out the project execution period.
2.5.3 Engineering Manager
Reports directly to the Project Manager regarding day to day project
activities but also has a reporting line to the Head of Engineering. His main
responsibilities are:
·
Coordination of all disciplines’
deliverables production assuring an accurate flow of interdisciplinary
information.
·
Supports in monitoring and planning engineering activities.
·
Avoid duplication or overlapping (correctness of interfaces).
·
Ensure consistency of documents and
drawings produced (design philosophy, technical integrity).
·
Manage and exercise engineering
change control and variation control till project completion.
·
Ensure communication with, and involvement
of, all interested disciplines to
each project.
·
Coordination of technical execution
of the project addressing the requirements of Cairn India.
·
Assisted by the lead discipline
engineers, defines all rules, codes, standards and basic documents which will
be used in each discipline.
·
Report status of projects in a
timely manner, highlighting issues that would impact on construction and
commissioning issues.
·
Ensure technical documentation on
completion of a project goes into the drawing management system.
5.5.3.1 Lead Discipline Engineers
Lead Discipline Engineers report to the Project
Engineering Manager. They are responsible for design and engineering within
their discipline. The responsibilities include:
·
Reviews project specifications and
drawings to ensure complete comprehension of the overall requirements,
identification of all quality requirements, and if required the resolution of ambiguities.
·
Implement work procedures.
·
Liaise with other discipline engineers on quality matters.
·
Initiate requisition packages
containing complete information relative to the material or service required.
·
Ensures that all personnel under
their control are fully conversant with the requirements of the Project Quality Plan.
·
Reviews equipment/material documentation against
purchase order.
·
Manage and ensuring smooth
implementation of multi-discipline engineering requirements in the
pre-construction, construction and commissioning phases by acting as an effective focal point in assimilating, anticipating the problems involved
and finding
a solution for the same to enable the construction and commissioning
to proceed with tight time and cost constraints to an acceptable quality.
5.5.3.2 Procurement Manager
Procurement
Manager reports to the Project Manager. Main responsibilities include:
·
Establishes the project approved vendor list in conjunction with Company requirements.
·
Ensure evaluation and selection of
approved Suppliers / Sub-Contractors, and to
prepare, review, update and maintain their list.
·
Reviews engineering requisitions for completeness of
commercial information.
·
Obtains quotations for material and equipment.
·
To float and follow-up the
enquiries with the approved Suppliers /
Sub-Contractors before finalizing
the purchase of materials / products / services.
·
Liaises with discipline engineers for clarification
of Purchase Order ambiguities.
·
Directs the activities of procurement personnel.
·
Responsible for the provision of
procurement, sub-contracting and logistics services for the project.
·
Monitor the performance of the
suppliers / sub-contractors periodically and appraise the quality management
for review.
·
To implement and maintain the
requirements of the quality management system in his area of control.
·
Ensure that the personnel under
control are adequately trained, qualified, and experienced to perform the
activities assigned to them and have access to the procedures describing the
management system.
5.5.3.3 Project Quality Assurance Manager
The Project Quality Assurance Manager (QA Manager)
functionally reports to Corporate Quality Assurance & Compliance Manager
and administratively to Director
Projects. His main
responsibilities are:
·
Managing and ensuring that the
principles of Quality Assurance are actively practised by all project personnel in their daily activities throughout the duration of the project.
·
Ensuring that the requirements of
this Project Quality Plan, associated procedures and work instructions are
integrated into the working methods of project personnel, and that objective evidence of compliance with
specified requirements is generated.
·
Monitor contractors and major
suppliers to verify that they are complying with their own individual Quality
Management Systems applicable to their contracted scopes of work/supply.
·
Operate an internal audit program
utilising qualified personnel independent of the area being audited
to determine the effective application of the quality
management system.
·
Identify and initiate suitable
corrective and preventive actions for non-conformance detected or anticipated
and ensure effective follow-up, verification and closeout of corrective &
preventive actions to address deficiencies.
·
Review and approve Subcontractor’s
Quality Plan, Quality Control Plans, Work Procedures and qualification of
Quality personnel.
·
Organise external audits of
subcontractor’s Quality System in order to ensure effective implementation of
their Quality System.
·
Overall control of all inspection, measuring &
test equipment.
·
Ensure that the personnel under
control are adequately trained, qualified, experienced to perform the activities assigned to them
and have access to the procedures describing the quality management system.
·
Promoting and ensuring feedback of
project experience together with input from new technology, plus feedback from
audits, to ensure continuous improvement of the
management system is realised.
·
Ensure relevant QA and QC training
for all site personnel and ensure all personnel understand and effectively
deliver their QA and QC responsibilities as per Quality Plan and Procedures.
5.5.3.4 Site Manager
The Site Manager reports to the Project Manager and is
responsible for planning and execution of all Field Construction operations at
each site. The main responsibilities include:
·
Liaises with Company Construction Team.
·
Liaises with Construction Sub-contractors.
·
Ensures that the necessary
resources are allocated to implement the Project Quality Plan.
·
Ensures that qualified personnel
are assigned to construction supervision and that they have the proper tools
and equipment to perform their functions.
·
Identifying and estimating
resources requirement, hiring of special equipment/services and organising
procurement / mobilisation of special equipment/services.
·
Implement appropriate corrective
and preventive actions to eliminate the non- conformances/customer complaints,
if any, identified during site inspections/audits.
5.5.3.5 QA/QC Superintendent (Site)
The QA/QC Superintendent reports functionally to the Project QA
Manager and administratively to the Site Manager. The main responsibilities
are:
·
Implementation inspection, testing
and examination in accordance with Project Quality Plans.
·
Monitor construction quality
parameters and controls any deviation from
the requirements.
·
Handles reported non-conformances
including investigation, recommendation of
remedial action and confirmation of corrective action.
·
Monitor and review defect levels,
advising and discussing remedial actions with Construction Manager / Superintendent.
·
Monitor subcontractor’s activity as
per the subcontractor’s approved quality plans, and their performance.
·
Provide guidance in analysing the
causes of non-conformance observed & verify implementation of
corrective/preventive actions.
·
Ensure that the internal and
external audits are carried out as per the audit schedule and follow up is carried out on
non-conformities issued.
·
Provide feedback to Project QA
Manager on all Quality related matters including training needs for QA/QC personnel.
·
Oversees the quality, content and consistency of all
inspection reporting.
·
Ensures equipment/material is
accompanied by correct documentation/reporting and calibration certificates.
5.5.3.6 QC Discipline
Inspectors (Site)
The QC Discipline Inspectors report to the QA/QC Superintendent.
They are responsible for assisting him on site quality control related
functions. The responsibilities include:
·
Implements relevant project quality control plan /
inspection and test plans.
·
Carry out inspections and surveillances.
·
Prepares inspection reports / quality records.
·
Reviews inspection and test records and authorizes
them for Contractor.
·
Reviews material certificates, calibration certificates, and all other applicable documentation of a procured product.
·
Reports non-conformance’s and assists in
implementing corrective actions.
·
Witnesses critical activities and
processes such as procedure qualification, welder / operator qualification,
production welding etc.
·
Conducts stage / final inspection
and releases the product for the further processing.
2.5.4 Management Representative
The Project QA Manager (as member of Cairn’s Project
Management Team) will be appointed
as the Project Management Representative,
who, irrespective of other responsibilities
and authorities, has
responsibilities and authorities that include:
a)
ensuring that processes needed for the Project QMS
have been implemented and
are maintained,
b)
reporting to
the Project Management Team and
the Executive Management
Representative (Corporate Quality Assurance & Compliance Manager at Cairn’s Corporate
Level) on the performance of the Project
QMS and any need for improvement, and
c)
ensuring the promotion of
awareness of stakeholders requirements throughout the project organization.
2.5.5 Internal Communication
To control and to centralize the communications of the Project, all
official Project communication shall be
addressed to the Project Manager.
The
correspondence shall be addressed as follows:
Technical Issues: to the Project Engineering Manager. Copy of this
correspondence should be sent to the Project
Manager.
Technical day-to-day information shall be handled directly between
Contractors’ task force
members and Cairn’s technical specialists assigned to the Project.
Communication is carried out by means of Emails,
letters, telefaxes, transmittal
forms, meetings and reports. The use of e-mails should be limited to non-formal communication.
Internal corporate communication between Cairn’s Project
Team and Cairn’s Corporate Management
shall be properly implemented as per the communication processes
established by the Integrity Management System (IMS) in
section 3.0. The Project Manager shall ensure that internal corporate
communication takes place regarding the effectiveness of the QMS.
This kind of communication is ensured through various processes
including, but not limited to:
-
Internal media such as memorandum,
email, use of corporate Intranet, postings on information boards, and hand to
hand document and record distribution, including management orders and directives
-
Meetings necessitated through the operation of the QMS.
-
Regular employee meetings where
project related problems are discussed, including any documented meeting minutes
-
Problem related meetings between management and
department heads
2.6
Management Review
The Project Manager shall sponsor periodic Management
Reviews (every 6 months) of the Project Quality Management System. The Reviews
shall be attended by the Project Management Team members.
These reviews shall be formal, and recorded in detail,
to monitor the effectiveness of the Project Quality Management System to ensure
that:
-
The Project Quality Management
System is, and shall remain, appropriate to the Project objectives and is effective.
-
Audit activities are pertinent and
that findings and recommendations arising are properly evaluated and executed.
-
Identified deficiencies are corrected in a proper
and expeditious manner.
-
All other matters of any concern are examined.
These reviews shall be identified on the Audit and
Review Schedule (DECO-RX-PM-SCH-0100)
and shall compliment the ongoing feedback and improvement of the Project
Quality Management System in its day to day implementation.
Findings and recommendations arising from these reviews
shall be reported to Cairn’s Project Director and Corporate Management.
Follow-up, verification and close-out of actions arising
from such reviews shall be performed and reported by the Project Quality
Manager.
The input data for Management reviews will include:
a) Results of all
types of audits,
b)
Stake holder’s feedback and complaints,
c)
Process performance and product conformity (see 7.1),
d)
Status of preventive and corrective actions,
e)
Follow-up actions from previous management reviews,
f) Changes that could affect the QMS, including changes to applicable
industry standards, and
g)
Recommendations for
improvement.
The output
from the management reviews shall include decisions and actions related to:
a)
Improvement of the effectiveness
of the quality management system and its processes,
b)
Improvement of product related to stake holder’s requirements, and
c)
Resource needs.
3 RESOURCE MANAGEMENT
3.1
Provision of Resources
Cairn India, as a project governance organization, initially
establishes Cairn’s Project Management Team resources –by means of the Project
Manager- based on the required capacity for monitoring contractors’ performance
as per Cairn Corporate polices and requirements.
As the project evolves, additional resources changes in the Project Management Team structure will be handled by Project
Manager and properly
communicated to Cairn’s Corporate Management.
Project Management Team shall continuously evaluate the
ability of contractor’s resources
(adequate physical space, services, equipment and materials addressed to
the Project) for effectively and
efficiently executing the works at Cairn’s best interests as per the contract
agreements.
3.2
Human Resources
3.2.1 General
The Project Management Team (Project Manager / Discipline
Leader) ensures the availability of competent and qualified Human Resources on
the basis of their education, training, skills and experience. These criteria
are applicable for both: Cairn’s and contractors’ project personnel.
Cairn’s Project Management Team and / or Discipline
Leader shall evaluate contractors’ personnel qualifications related with their
corresponding areas in order to asses their competence for performing the work.
Records regarding competence shall be kept and be available for review, when required.
The project organisation for the Project shall be
established as per the considerations included in the Document No: DECO-RX-PM-PLN-0001,
Development Team Organization & Resource Plan, and it is represented by means of the
organisation charts shown in document No: DECO-MRX-PM- CHA-2000, Project
Organization Chart.
3.2.2 Competence, awareness and training
Appointing competent personnel on the basis of
education, experience, training
and/or demonstrated ability is a
Project guideline for both, Cairn and Contractors personnel. However, the
Project also ensures that all personnel receive the following induction programs:
-
Project Organization and QMS.
-
Induction on HSE.
-
General Induction on Project Development.
Additional training shall be given to the project team members when adopting and
implementing new tools and techniques.
Supervisory positions are responsible for ensuring that the
personnel under their charge are knowledgeable of the Quality Management System
as it applies to their job functions.
The Project Quality Manager is responsible for providing training
and assistance related to quality issues.
3.3
Infrastructure
Mangala Project determines, provides and maintains the
infrastructure needed to achieve conformity to project requirements, including:
a)
buildings, workspace, camps and associated utilities,
b)
process equipment (both hardware and software), and
c)
supporting services (such as
transport or communication) Modifications that may be necessary
to the infrastructure are discussed through:
-
Periodic meetings involving relevant personnel, including the documentation of meeting results,
-
Discussion during the management review process (Section 5.6 – Management Review).
When evaluating contractors technical bids, infrastructure aspects
as mentioned in this
section shall be taken into consideration.
Contractors shall also provide and maintain the infrastructure
needed to achieve conformity to project requirements.
3.4
Work Environment
The work environment needed to achieve conformity to project
requirements and to meet its own internal needs is identified and managed by
the Project Manager.
Work environment needed to achieve conformity to project
requirements include, but is not limited,
to the following aspects:
a)
Provision of suitable work spaces
and offices, including appropriate ergonomic, physical, and sanitary-hygienic conditions
(temperature, humidity, illumination level,
pollution).
b)
Provision of decent and well
maintained personnel camps/living quarters and food storage and preparation
facilities.
c)
Supply of personal protective
equipment (e.g. clothes, hardhats, glasses, earplugs, gloves, etc.) in
accordance with the Health and Safety Program.
d)
Team building events/activities,
encouraging a creative and comfortable work environment for personnel.
e)
Ensuring the security of the facilities and working spaces.
4 PROJECT IMPLEMENTATION
4.1
Project Implementation Planning
4.1.1 Project Processes and Interfaces
(Project Process Map)
In general the Rajasthan Northern Area Development
Project is one process transforming input requirements (the intent for Developing
the Rajasthan Northern Area Fields in order to produce oil and increase its
value according to all the specific requirements and constraints established by
the Government of India, the Licence, Cairn India Corporate, etc) into a final
product or output (Surface Facilities in full compliance with the initial
requirements and the design intent).
In doing so, the Project can be divided into the
following sub-phases keeping in view the Cairn
Gated Process (CGP):
The First Phase considers the Technical Definition –in
terms of engineering- of the final Product.
This Phase is called “Engineering and Design” and it could also be split
into Conceptual, Basic and Detail Engineering Design. Each one of them produces
specific outputs considered “in process products”. However the main outcome of
the Engineering and Design sub-process are all the technical considerations
(“Deliverables”) that will define the final product. Main controls for this
specific phase are detailed in section 7.3 (Design and Development) of this PQP.
In terms of the Cairn Gated Process, the Project Engineering and
Design phase mainly covers:
-
Select Phase (Gate 2): Front End Engineering
and Design (FEED)
reaching a level
allowing Development
Definition.
-
Define Phase (Gate 3): Front End Engineering
and Design (FEED)
until having
submitted for approval the Project Execution Plan and the Field Development Plan and Budget.
-
Sanction Phase (Gate 4): Detail Engineering and Design.
The Second Phase utilise a specific set of the technical
considerations already defined in order to purchase equipment, materials and
services that will also be required for the Final Product as per the design intent. This sub-process is called
“Procurement” and is mainly controlled as per the requirements established in
section 7.4 (Purchasing) of this PQP.
In terms of the Cairn Gated Process, the Procurement phase is mainly
covered by:
-
Construct Phase (Gate 5): Procurement,
Construction, and Pre-Commissioning.
The Third Phase will incorporate both “in process”
products outcomes from the previous phases transforming them into a final
product and maintaining the original design intent as per the requirements
identified since the beginning of the Project. This phase is the “Construction
and Installation” Phase (Section 7.5 of this PQP) and it is conceived for
ensuring the control of all of the sub-processes required in the development of
the final product. This phase mainly focus
in detailing the required
controls for the Construction Phase including Pre-Commissioning, Commissioning
and Start up.
In terms of the Cairn Gated Process, the Construction phase –as
described above- is covered by:
-
Construct Phase (Gate 5): Procurement, Construction, and Pre-Commissioning.
-
Operate Phase (Gate 6): Commissioning and Handover to operations.
The Project QMS is a valuable tool in order to ensure
that every single variable affecting the quality (defined as the compliance
with the original requirements) of the facilities intended to be developed (all
along the different “in process” stages, since
the conceptual design until the
start up of the plant) are properly
controlled, which increase in great measure the ability of the project
for achieving Technical Integrity.
The “Project Process Sequence and Interaction Map” shows
the interfaces among the different key processes (see Attachment 1).
4.2
Processes related with the Stakeholders
4.2.1 Determination of stakeholders’
requirements related to the Project
As mentioned before in Customer Focus (section 5.2), the
Mangala Project considers the stakeholders who have a particular interest in
the Field Development as customers, including but not limited
to:
· Cairn India
Limited (Corporate)
· Strategic Partnerships
· Field owners
· The government of
India and its entities (ministries, institutions, etc), including Rajasthan
authorities.
· Rajasthan communities.
In terms of the Cairn Gated Process, all these
requirements have been identified and captured since the “Development Statement” (Gate 1 -
Asses), which described the basis of the project, its requirements and the underlying
assumptions, passing through the “Development Definition” (Gate 2 – Select), which allowed the selection of
the preferred development scheme, until reaching the “Field Development Plan”
(Gate 3 – Define), which provided the required detail of the selected
Development option and the commencement of the Detail Engineering Design Phase.
The Mangala Project Execution Plan DECO-MRX-PM-PEP-0001
includes the main requirements established by Cairn India at corporate level,
the licence to operate (Production Sharing Contract RJ-ON-90/1) and the Indian
Government regulations (including environmental and safety
regulations as per document DECO-RX-PM-SOW-0024 “Regulatory Requirements
and Approvals/Consents”), among others.
By means of document DECO-RX-PM-SOW-0043 (Statement of
Requirements and Basis of Design) the design requirements to be met and
latter maintained during the procurement and construction of the facilities are
mainly determined and recorded. This document “presents the main design
parameters and decisions already made, together with the requirements to be met
in the design of the surface facilities for the Mangala Field Development”.
Main Contractors utilised by the Project Management Team
for developing the Project could also produce their corresponding Contract
Execution Plans as per their particular scope of works. Such documents shall be
carefully reviewed by Cairn Project Management Team in order to ensure its
alignment with the main requirements identified.
4.2.2 Review of stakeholders’
requirements related to the project.
All along the project execution (not only at the
beginning of the project), the stake holder’s requirements shall be verified in
order to determine whether new stakeholders' requirements or changes in
existing requirements already considered
are applicable for the Project and how are they going to be implemented. Both cases
will require an analysis of the Project impact and a proposal leading to an
implementation plan.
Project Manager shall be responsible for ensuring that
every new stakeholder requirement be properly identified by means of the
Project Management Team, communicated and evaluated on its applicability and
impact to the project.
4.2.3 Stakeholders Communication
All information and communication with stakeholders in India are
mainly handled by means of Cairn India offices in Gurgaon and then transmitted
to the Project via the Project Manager.
The Project determines and implements effective arrangements for
communicating with Cairn India Corporate in relation to:
a) project information,
b) enquiries or contracts, including amendments, and
c) stakeholders’
feedback, including complaints.
Among the arrangements in place in order to facilitate
communication with Cairn India functions having interfaces with the Project and
the Project Management Team, Cairn has implemented a set of tools such as the
Documentum™ system, the Tejas Online Portal Service, Cairn’s email service and
providing staff mobiles with international calling service.
4.3
Design and development
Cairn, as a project governance organization, plans and
controls the Engineering and Design Phase
of the Mangala Project through the appointment of a Project Specific
Organisation (the Project Management Team) and contracting a specialist engineering
design contractor.
All the engineering and design processes affecting
project conformity with requirements shall be properly controlled in accordance
to this section of the PQP and applicable Project Procedures established for
controlling the design deliverables production (refer Detail Engineering Design
Process Flow chart is shown in Attachment 3).
Document DECO-MRX-J-SDP-0100 “Engineering Execution
Philosophy”, provides a specific guideline for managing and controlling the
Project Engineering and Design Processes.
All engineering design activities to be performed by
contractors shall meet the principles
established in this document. It is the responsibility of the
Engineering Manager to maintain objective evidences that the contractors have
met these principles.
4.3.1 Design and development planning
In order to manage the Project Detail
Engineering and Design process of the surface facilities the following stages
are required to be completed by the engineering contractor:
-
Front End Engineering and Design
(FEED) Review (Definition Phase): The primary objective for this Phase is to
freeze the Basis of Design. Deliverables in this stage include PFDs, UFDs, plot
plans and P&IDs, as well as various details, data sheets, specifications
and studies required to support the Detail Engineering and Design.
-
Review/update of Detail Engineering and Design Inputs.
-
Identification of Detail
Engineering and Design Deliverables. Preparation of the
Master Schedule as per the WBS and the Deliverables Register (or Master Document Register
“MDR”).
-
Development of Deliverables following the
appropriate revision process,
-
Execution of Design Reviews as
planned: Process Safety Review, HAZID, HAZOP, Plot Plan Review, Area
Classification Review, Constructability Review, Final Safety Review, etc.
-
Control of Detail Engineering and Design Changes.
Where required, established or existing contractor
procedures can be utilised to cover the control of the design during all
stages. For this particular project the following key documents were
prepared by the Engineering Contractor
for the performance of the design activities:
DECO-MRX-PM-DCR-2100
The Master Document Register (MDR),
DECO-MRX-R-SOW-2100 Detail
Design HAZOP Review Charter – Terms of Reference, DECO-RX-R-PEP-2000 Health, Safety and Environment Execution Plan,
DECO-RX-J-PRO-2012 Verification
and Approval of Design Documents and Drawings, DECO-RX-J-PRO-2013 Squad Checking Design Drawings Procedure,
DECO-RX-J-PRO-2014 Drawing
and document Issues, DECO-RX-J-PRO-2016 Design
Change Control,
DECO-RX-PM-PRO-2001 Electronic
Exchange of Vendor Documents, DECO-RX-PM-PRO-2005 Interface Management Procedure,
DECO-RX-PM-PRO-2021 Vendor Data Processing,
DECO-RX-R-PRO-2010 Environmental
Design Review Guidelines. DECO-RX-CM-PRO-2004 Request
for Information Procedure,
DECO-RX-CM-PRO-2012 Construction
Change Management Procedure
Significant interfaces between the various Project
Engineering Disciplines, Cairn Project Team, the Contractor team,
Sub-Contractors and other outside parties are to be identified, documented, and
progressed by means of the Cairn Document DECO-MRX-J-SDP-0100 “Engineering
Execution Philosophy” and the “Interface Management Procedure”,
DECO-RX-PM-PRO-2005.
4.3.2 Design and development inputs
The design requirements to be met are mainly determined
and recorded by means of document DECO-RX-PM-SOW-0043 (Statement of
Requirements and Basis of Design). It presents the main design parameters
together with the requirements to be met in the design of the surface
facilities for the Mangala Field Development.
Other applicable documents that can be considered as
design inputs for including functional and performance design requirements,
applicable regulatory and legal requirements and other requirements such as
environmental impact and safety for operation of facilities are:
Title |
Numbering |
Licence (Production
Sharing Contract) |
RJ-ON-90/1 PSC |
Regulatory Requirements and Approvals/ Consents |
DECO-RX-PM-SOW-0024 |
Mangala Project Execution
Plan |
DECO-MRX-PM-PEP-0001 |
FEED Project Summary
Report |
DECO-MRX-PM-REP-2100 |
Risk Assessment Study
(Appendix 2) |
DECO-MRX-PM-REP-2100 |
The Contractor’s execution experience of previous
projects of a similar nature shall also be considered as a design input.
All these input requirements shall be constantly
reviewed for adequacy and
resolution of incomplete, ambiguous or conflicting
requirements by the Project Engineering Team (Cairn Team/Contractor Team) and
the results shall be communicated to Project Management if any deviation is identified.
4.3.3 Design and development outputs
Design outputs (Deliverables) are
recorded in drawings and documents suitable for verification against the detail
engineering and design inputs. These are prepared, reviewed, approved and
submitted to Cairn as established in the Project Engineering Execution
Philosophy (DECO-MRX-J- SDP-0100) and the present document.
The Deliverables List shall be the result of the
Engineering Team compilation (by both Cairn Project Team and Contractor
Discipline Engineers) of all the technical documents and drawings required to
be produced based on the Basis of Design, main P&IDs, the list of equipment
and lines, etc., as per Project’s WBS.
The Master Document Register (MDR), for the facilities
scope of work is given in the document No. DECO-MRX-PM-DCR-2100. The Lead
engineers shall ensure that latest status of relevant engineering discipline
deliverables are accurately entered in the Mangala Project MDR, which is
viewable to the project team members.
In order to have a “seamless hand over” of electronic
project deliverables to Cairn Operations, the electronic management tool
“Documentum™” will be used providing also a control document warehouse for
storage and retrieval of all electronic documentation and easy access to the
documentation through controlled security levels. Cairn Project Document
DECO-RX-PM-PRO- 0005 (Detail Design
& Engineering Team – Document Control Procedure) includes a description of
this tool functionality.
4.3.4 Design review / Technical
Integrity Review
Design reviews shall be accomplished at specific stages
during the life of the Project, in
accordance with formal procedures provided in the project HSE Management
System Manual (DECO-RX-R-MAN-0100), and by a number of methods including:
·
P & ID Reviews
·
HAZID/HAZOP Reviews
·
SIL Assessment (requirements and analysis)
·
Quantitative Risk Analysis
·
Layout Reviews
·
Formal safety assessments by external safety consultant
·
Plot Plan Reviews
·
Hazardous Area Reviews
·
Operability Review
·
Safety and Operability Study of Electrical Systems
(SAFOP) study.
The reviews shall ensure, among other things, that the design:
·
can be constructed, inspected, tested, operated and maintained.
·
complies with the specific safety,
environmental, availability, operability and maintainability requirements.
·
Meets the individual and societal
risk acceptance criteria set by the
project and demonstrates that
operational risks are As Low As Reasonably Practical (ALARP).
Design reviews shall be carried out by representatives
of Cairn, 3rd party consultants and the Engineering Contractor from
each engineering discipline.
The timing of the reviews shall be dependent on the
progress of the project and the interfaces associated with different
disciplines. Records of these reviews shall
be documented and maintained
in accordance with project specific procedure DECO-RX-PM-PRO-2011 “Project Records Management”, prepared by the
Engineering Contractor.
Project design / safety reviews shall be scheduled to
correspond with the completion of project process definition documents (see the
Health, Safety and Environment Execution Plan, Doc. No. DECO-RX-R-PRO-0062).
Typically this will include:
·
PFD’s,
·
P&ID’s,
·
Electrical
One-line Diagrams,
·
Area
Classification Diagrams,
·
Plot Plans / Equipment Location Plans, and
·
Safety Equipment Layouts.
A final design review shall be conducted and documented.
Approval of final design review shall be made by “individuals other than the
person or persons who developed the design”. Operations representatives must be
part of this final review.
Various HSE assurance activities shall parallel the
design development, summarised in the HSE Execution Plan. These activities will
include a series of Project HSE Reviews
(PHSERs) organised by Cairn India corporate and utilising non-project team
members to provide extend verification of
the design and suitable assurance
to the Cairn India board, parties and other key stakeholders that
the project has successfully met its stated HSE
objectives and future work is planned with HSE as an integral part.
HSE Actions from the design phase shall be recorded,
actioned, approved and closed out in accordance with the HSE Actions Monitoring
procedure (DECO-RX-R-PRO-0018).
4.3.5 Design and development verification
Design verification is carried out on all design deliverables to ensure that they:
-
Meet the design input requirements for Detail Engineering and Design;
-
Provide appropriate information for purchasing,
construction and testing activities.
-
Contain or make reference to the
acceptance criteria, for each element of the facilities (system, sub-system,
line, equipment, etc) being designed.
-
Specify the characteristics of the
facilities (or any element of the same being described by means of the design)
that are essential for its safe and proper use.
Other aspects of the deliverables that shall be taken into
consideration during the verification are:
-
Deliverables are correct, clear and unambiguous.
-
Deliverables comply with the technical, format and
presentation requirements.
-
Deliverables are adequately substantiated by calculations.
-
All interfaces have been identified and addressed.
Qualified Engineers other than those who prepared the
deliverables perform this verification as per the project specific procedure
DECO-RX-J-PRO-2012 “Verification and Approval of Design Documents and
Drawings”.
Cairn shall review all documents produced by the
Engineering Contractor as identified in the Master Document Register.
Design documents that pertain to or reflect the Design
Criteria, or could have an impact on two or more project disciplines or other
engineering deliverables shall be routed
for interdisciplinary checks (IDC) in accordance with the
“Verification and Approval of Design Documents and Drawings Procedure”
DECO-RX-J-PRO-2012 and the “Squad Checking Design Drawings Procedure” DECO-
RX-J-PRO-2013.
Project Deliverables (technical drawings and documents)
shall be checked, reviewed and approved in accordance with the matrix shown in
the Attachment 4 (“Review, Approval and Squad Checking of Documents and Drawings”).
Documents and drawings shall be issued in accordance
with Cairn Project Numbering System Procedure DECO-RX-PM-PRO-0002 and approved
document control practices.
After documents have been approved by Cairn, all further
revisions to specifications and design documents require Cairn approval.
Every document is to reflect a unique revision and revision date.
For all Project deliverables (documents and drawings) the following
revision indicators shall apply:
o A1, A2, A3 … etc - Work in progress / IDC/ Issued for
client review
o B1, B2, B3 … etc - Approved for Design / Enquiry / Issued
for Implementation
o C1, C2, C3 … etc - Approved for Construction / Purchase
o Z1, Z2, Z3 … etc - As Built
o V - Void / Obsolete
All issues of Project drawings and documents must
include an “issue description” in the revision description block, which shall
be in accordance with the project procedure DECO-RX-J-PRO-2014 “Drawing and
document Issues”.
Vendor documents will be reviewed as per Cairn documents
DECO-RX-PM-PRO-0003 (Requirement for the
Delivery of Supplier Documentation & Data) and the Engineering Contractor
procedures: DECO-RX-PM-PRO-2021 (Vendor Data Processing) and
DECO-RX-PM-PRO-2001 (Electronic Exchange of Vendor Documents).
The output from computer calculations shall be verified
as for design documentation and shall be checked by alternative calculation
methods. Computer data shall be secured from loss or damage by regular back-up and protected from
unauthorised access.
All design software shall be subject to validation prior
to use on the project. Such validation shall be completed either corporately or
on the Project.
4.3.6 Design and development validation
The Project shall utilise design validation to ensure
that supplied product (Surface Facilities) conforms to Contract requirements.
During the fabrication of engineered equipment, the
design validation is performed by means of the tests specified by the industry
standard of reference, functional and/or operational tests (Factory Acceptance
Test - FAT) or field performance tests (Site Acceptance Tests) as applicable
and required.
During the construction phase, the validation of the
design is performed prior to the handover of the Facilities to Cairn India
Operations, during the Commissioning phase of the Project and will be
established in specific commissioning procedures as per each system
(sub-system) limit. The results will be recorded in test reports and
relevant actions will be followed-up
by the Commissioning and Quality
Departments. Cairn Project Document DECO-RX-OP-PRO-0001 (Handover Procedure
& Protocol) includes a general description of these activities.
4.3.7 Control of design and
development changes
Procedure DECO-RX-J-PRO-2016 “Design Change Control” shall be used
in order to document changes in design involving:
a) the approved
design criteria,
b)
the approved project specifications and procedures,
c)
approved industry codes and standards, and
d)
any other basic design documents
which have received
prior Cairn review and/or approval.
Requested changes to drawings that have already been
“Issued for Bid” or “Issued for Design” shall be documented using a Design
Change Request (DCR). Furthermore, a “Design Change Log” shall be developed in
order to record all changes in Design as established in the above mentioned
procedure.
Changes in design shall also be examined for the
implication of changes in scope or
the requirement of a review for
HAZOP issues.
In addition, changes that occur during or subsequent to
the performance of the project HAZOP study
must be reviewed and approved by both Cairn and the Engineering Contractor for
impact to the safety, operability, and
function of the facilities. All resulting approval shall be appropriately
logged. The safety elements review shall be implemented under the Cairn
Document DECO-RX-R- PRO-0106, “HSE Management of Change Procedure”.
Other
considerations that shall be ensured by the Design Change Control procedures
are:
-
Design changes are reviewed and
approved, where possible, by the same personnel who performed the original design.
-
Information concerning design
changes is transmitted to all personnel affected by
the design change, in a
controlled and timely manner.
-
The technical impacts of such
changes are considered and the relevant actions performed and documented.
-
All changes out-with the Contract are subject to
formal variation approval.
During the revision and approval of Vendor’s design for
project packages, equipment or materials, every single change to the design specifications provided shall be evaluated in its result
recorded by means of the following
procedures: “Request for Information Procedure”, DECO-RX-CM-PRO- 2004 and
“Design Change Control”, DECO-RX-J-PRO-2016.
Field Engineering will also require the appropriate
management of changes in design by means of the “Construction Change Management
Procedure” DECO-RX-CM-PRO-2012 and the Procedure DECO-RX-CM-PRO-2004 “Request
for information”, which also provides guidelines for preparing, distributing,
and responding to Requests for Information (RFIs) issued by the
construction contractors in the job site.
4.4 Procurement and Contracting
4.4.1 Purchasing process
The Project ensures that purchased products included in
the project’s scope and affecting Project requirements compliance (packages,
equipment, materials and services) conforms to specified purchase requirements.
Document DECO-RX-CN-PRO-2000 “Procurement Process Flow
Chart” details the complete series of steps and interfaces established for
Purchasing Products in the Mangala Project.
A more general and summarised representation of such process is
shown in Attachment 5.
The Project will coordinate the Procurement and
Contracting activities by means of several
interfaces involving a Cairn Procurement Team in the Engineering Contractor
offices, a Cairn
Corporate Procurement Team coordinating activities in
India Headquarters and a Procurement support team provided by the Engineering
Contractor as part of its scope of work. As required by the Project other interfaces will take place
such as the involvement of a Procurement team by the Construction Main Contractor.
The following project specific procedures describe the
main activities of these processes to be developed by the Engineering
Contractor’s Procurement Team, on interface
with Cairn Procurement
Teams:
-
DECO-RX-PC-PRO-2003 “Requisitioning”.
-
DECO-RX-PC-PRO-2004 “Purchasing”.
-
DECO-RX-PC-PRO-2006 “Expediting”.
-
DECO-RX-PC-PRO-2007 “Traffic”.
-
DECO-RX-PC-PRO-2008 “OS&D Reports”.
-
DECO-RX-PC-PRO-2009 “Invoice Releases”.
-
DECO-RX-PC-PRO-2010 “Material
Management System-MATCON”.
Ad-hoc procedures detailing the tender assessment
process for each construction package shall be used by the Project team
appointed for evaluating construction contractors’ tenders in order to ensure the best selection of contractors
capable of offering tangible benefits for the Project execution.
The Project
Quality Manager is responsible for ensuring QA/QC participation in:
-
Evaluating the technical Bids (QA/QC content).
-
Verifying purchase orders with regards to Quality.
-
Evaluating vendors’
performance.
-
Verifying products as per relevant Inspection
Matrices and approved ITPs.
The Procurement
Manager:
-
Ensures that the purchase packages
are adequately defined on their content and since a commercial perspective;
-
Manages the Expression of Interest (EOI)
pre-qualification process.
-
Ensures the proper coordination of
the bid clarification process where procurement department acts as a link
between engineering and vendors.
-
Selects qualified suppliers and holds an “approved
vendor list”;
-
Maintains evaluation records.
The Discipline
Engineer
-
Prepares technical documents and ensure their review
before distribution to supplier.
-
Evaluates the technical bids and incorporate inputs
from other groups (QA/QC, HSE).
-
Reviews Vendors data (as per DECO-RX-PM-PRO-2021
“Vendor Data Processing”).
4.4.2 Supplier Selection
It shall be ensured that Suppliers are selected on the basis of
their ability to supply products
meeting the quality and delivery requirements specified in the purchase documents.
The evaluation and selection of Suppliers will be performed as per
Procedures DECO-RX-PC- PRO-2003 “Requisitioning” and DECO-RX-PC-PRO-2004
“Purchasing”.
Project Engineering Team shall be involved on the
preparation of all the technical data required
(such as descriptions, specifications, quantities, etc.) and their
related attachments (Inspection Matrix
Forms, Datasheets, Drawings and Sketches, General Notes, Vendor Documents, list
of all relative written specifications and standard drawings, etc.), during the
stage of clarifications (previous to the
placement of the purchase order) and during the review and approval of Vendors’
designs for fabrication.
All commercial aspects shall be handled by the Procurement
Department.
Only suppliers approved by correct process and
procedures are eligible. Preference will be given to those Suppliers having a
certified Quality Management System in place as per ISO 9001:2000 and/or ISO/TS 29001:2003. However for all
cases, suppliers’ QMS shall be assessed,
commensurate with the type of goods and scope of services provided.
For suppliers intended to provide equipment requiring
specific design activities, ISO/TS 29001 shall fully apply and Project Specific
Quality Plan shall reflect this requirement. For suppliers without design
activities the controls in order to ensure an adequate management of design
information received or under Cairn’s review for approval shall be clearly
stated. For suppliers of stock items or non design, non-manufacturing services,
applicable clauses of ISO/TS 29001 shall be implemented as per a process
mapping describing all the activities in order to enforce the Purchase Order in
the agreed terms. Document DECO-RX-Q-SP-0100 “Equipment Criticality and QA/QC
Surveillance” includes a matrix of reference for applicable ISO/TS 29001
clauses as per the type of goods and scope of services to be provided.
Suppliers shall submit objective evidence of their
Quality Management System and associated certification with the bid. Suppliers
shall confirm their commitment to quality and supply sufficient information
about their Quality Management System to allow the evaluation of the
bid since a quality point of view.
4.4.3 Purchasing information
Purchasing information shall describe the product to be purchased,
including where appropriate
-
requirements for approval of
product (approval criteria as per the Inspection and Testing requirements and
Factory Acceptance Testing requirements), procedures, processes and equipment,
-
requirements for qualification of personnel (i.e.
welders, operators, engineers), and
-
supplier documentation (including vendor
certificates) requirements,
-
quality management system requirements.
The Project shall ensure the adequacy of specified
purchase requirements prior to their communication to the supplier.
The purchasing information shall state the intended
verification arrangements and method
of product release (i.e. Factory
Acceptance Test), where the Project intends to perform verification at the
supplier's premises (see 7.4.4).
Procedure DECO-RX-PC-PRO-2003 (“Requisitioning”)
provides guidelines for the preparation of a standard project requisition
(Material and Service Requisition or MSR) as part of the Request for
Quotation (RFQ) Package. It is applicable to all requisitions that are
prepared to formally inquire and purchase materials (including equipment) and/or services
during the execution
of the project.
The technical part of the requisition shall include
technical data such as descriptions,
quantities, cost code numbers, and a
list of attachments such as data sheets, drawings, and specifications as
applicable.
Such technical data is prepared by Project Engineering
as well as their related attachments (Inspection Matrix Forms, Datasheets,
Drawings and Sketches, General
Notes, Vendor Documents, list of all relative written
specifications and standard drawings, etc.).
Procedure DECO-RX-PC-PRO-2004 (“Purchasing”) provides
guidelines for developing, approving and issuing purchase/change orders.
Purchase Orders will contain the following minimum information:
-
Address, telephone, fax number and Email address of Vendor.
-
Purchase Order number, revision number and date.
-
Line item number, quantity, description and tag number of items to be purchased.
-
A listing of all applicable specifications and drawings.
-
Required delivery dates for all
materials ordered. Set a definite date or delivery window (not number of weeks).
-
Ship-To address.
-
Receiver’s name, address, e-mail, telephone, and fax numbers.
-
Cost Code (ARE number, etc. by line item).
-
Preparer’s name, address, e-mail, telephone, and fax numbers.
-
Invoices address instructions and terms.
-
Terms and Conditions.
-
INCOTerms.
-
Technical Requirements as defined in the Requisition Package.
A Purchase Order
Package comprised of the following documents:
-
Purchase Order.
-
All listed attachments.
-
Technical Requisition (Issued for Purchase).
4.4.4 Verification of purchased product
The Project has established the inspection and/or other
activities necessary for ensuring that purchased product meet specified
purchase requirements as per the documents DECO-RX-Q-SP- 0100 “Equipment
Criticality and QA/QC Surveillance” and DECO-RX-Q-PRO-2008 “Vendor inspection Procedure”.
The evaluation of suppliers (type and extent of controls
applied to the supplier and the purchased products) shall be dependent upon the
type of product, the supplier's ability and the impact of product on the final facilities, as defined
by the assigned criticality rating.
The criticality rating is a quantitative identification
of the severity of a potential failure of a system, equipment, and/or service,
with regards to operability, safety, environment, and costs. It is established
by means of the method specified in the IMS Document “Criticality Rating”.
The selection of the appropriate Level of Surveillance
shall be initially based on the Inspection and Test Matrices included in the
purchase order documentation, but modified (adjusted) to reflect the specific
characteristics of Project by means of specific Inspection and Test Plans
(ITPs) required to be approved by members of the project quality function.
Surveillance by Cairn India shall be also designed to check the Supplier's
system and/or the goods in order to provide
confidence that quality is
adequate.
Company approved Third Party Inspection Agency (TPIA)
shall be nominated considering the
specific Inspection and Testing requirements for each case. TPIA
activities shall be coordinated by the Engineering Contractor, with direct
involvement and supervision of Cairn’s QA/QC Coordinator, as required.
Document DECO-RX-Q-SP-2000 “Vendor Quality Assurance
Requirements” details the minimum QA
requirements that vendors are required to comply with.
Document DECO-RX-Q-SP-0001 “Quality Assurance
Requirements Contractors” details the minimum QA requirements that contractors
are required to comply with.
Package Engineer shall ensure that these last two documents form
part of the MSR and the PO.
Purchased products also include a set of documentation
as established in the Document Requirement Schedule (DRS) prepared for each
Purchase Order. This schedule details what
specific documentation shall be delivered by the supplier and when. This
documentation shall be reviewed and collected as per the approved ITPs.
4.5
Production and service provision
The Project “production and service provision” includes
the following processes for the
Development of the Mangala Field: exploration drilling, well design,
well procurement, drilling and well completion, FEED, detail engineering and
design, contracting and procurement, construction, installation, commissioning
and hand over to operations.
Considering that the main controls for Engineering and
Procurement processes have been specifically described in sections 7.3
(Engineering) and 7.4 (Procurement), this section will
be mostly referred to detail the main controls established by the
Project QMS for the Construction and Installation activities, without
undermining the other phases required controls.
4.5.1 Project Execution Control
Cairn’s Projects Management, as a
project governance organization, plans and controls the Construction Phase of
the Mangala Field through the appointment of a
Specific Project Organisation (Project Management Team) and
the contracting of a Main Construction and
Installation Firm (Main Contractor).
The Project Management Team under the responsibility of the Project
Manager shall plan and control the
Construction, Inspection and Testing activities ensuring the following:
-
Availability of specifications,
plans, drawings, procedures, processes and work instructions that define the
characteristics of the construction, inspection and testing.
-
Use and maintenance of suitable
construction, installation, inspection
and testing equipment.
-
Availability and use of suitable measuring and
monitoring equipment.
-
Availability of work force
with proper qualification. Operators/Technicians shall be qualified to internationally recognized governing bodies.
-
Implementation of suitable monitoring and
measurement activities.
-
Implementation
of processes for release
and delivery and/or installation of product
and/or service
including applicable post-delivery activities.
See
Attachment 6 for Process Flow chart for Construction.
4.5.2 Validation of Project
Processes for Production and Service
Provision
All processes where the conformity of the resulting
output cannot be readily or economically verified by subsequent monitoring or
measuring (e.g. welding, concrete mixing, etc) shall be validated by the Project and formal Cairn approval
obtained prior to their execution. This includes any processes where
deficiencies become apparent only after the product is in use.
Validation shall demonstrate the ability of these
processes to achieve planned results.
The validation measures include
the following actions:
-
Identification, preparation and
approval of the procedure specifications and defined criteria for review and approval of the processes
(e.g. WPS),
-
Verification and acceptance of materials (same
material will be used for production),
-
Process qualification using approved equipment and
qualified personnel,
-
All qualification records (e.g.
visual, destructive and non destructive testing) generated, approved and maintained,
-
Revalidation when any essential variable is changed.
4.5.3 Identification and
traceability
The identification and traceability system shall be applied for the
following:
-
Pipes, valves, fittings, welding consumables.
-
Pressure retaining parts such as shells, heads,
flanges and tube sheets.
-
Welded joints and
welders.
-
Fibre optic.
-
HV Power transmission cables.
-
Other permanent items / equipment incorporated in
the construction.
-
Inspection, test and quality verification status.
Products and construction activities shall be identified
during all phases of product realization by means of legible and durable
markings maintained from initial receipt to final destination and/or by using
relevant follow-up documentation (i.e., a drawing indicating the specific drum
identification number from which a particular fiber optic cable installed was
taken, showing its location. This way the Fiber Optic installed can be easily
related to the vendor or manufacturer, the PO information and all the corresponding certificates and
testing applied to the same).
The identification of items of equipment and certified
materials, ITP and all test records shall be maintained by the project using
the corresponding tag numbers (as
applicable). Material certificates, construction welding book and
inspection reports are supporting elements for identification and traceability
of products.
Responsibilities for identification and traceability are as follows:
-
Design
Engineer specifies identification and certification
requirements in purchase documents.
-
Material
Controller verifies the required identification/certification during material
receipt.
-
Project
Quality Manager establishes and ensures appropriate system for
identification and traceability.
-
Construction team implements measures for
identification and traceability.
4.5.4 Stakeholders property
No Stakeholders supplied product is incorporated into the Mangala
Project.
4.5.5 Preservation of product
The Project Management shall preserve the conformity of
product (e.g. packages, systems, equipment, materials, etc.) from deterioration
or damage during project development until they are handed-over to Cairn
Operations. This preservation shall include
identification, handling, packaging, storage and protection and also
apply to the constituent parts of a product.
the Project Management shall review and approve (as
appropriate) the Vendors controls to be applied on Project products regarding
identification, handling, packaging, storage and protection during the delivery.
Packaging and marking of all materials to be sent to the
site shall be controlled to ensure compliance with specified requirements and
proper identification.
In the same way, during the Construction Phase
appropriate controls on site have
to be available for handling, packaging,
storage and preservation of products received,
installed and/or built.
A Material Storage and Preservation Plan is to be
submitted for approval by the construction contractor and should include all
activities, procedures and forms required for the purpose of identifying,
inspecting, off-loading, receiving, handling, storing and preserving all the
contractor- supplied equipment and materials. This plan is to incorporate all
equipment vendor’s storage / preservation recommendations, safe working
practices and special handling requirements and shall be continuously
maintained and updated as necessary. An organization chart depicting personnel
and responsibilities for scheduled activities
and follow-up through out the work is to be included.
Manufacturers' recommendations with regard to storage
and preservation of the equipment shall be strictly adhered to.
Goods, which fall under statutory regulations for
dangerous goods, shall be packed, marked, and stored separately in accordance
with the relevant regulations.